X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254222208003

Well Details

Well ID: 0254222208003
Loading map...
Location: 00/08-22-025-22W4/3
Location Alias: 00/08-22-25-22 W4M
Location Alias 2: 00/08-22-025-22 W4/03
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 22
County/Municipality: Wheatland County
Well Name: ECA ECOG PARFLESH 8-22-25-22
Operator Name: Lynx Energy ULC
License Number: 0411102
License Date: 2009-06-25
License Status: Amended
Spud Date: 2010-01-23
Final Drill Date: 2010-02-10
Well Total Depth: 839.00 m
Surface Hole Latitude: 51.148586
Surface Hole Longitude: -112.978612

For data sources see[1][2]

Well History

Date Event
2009-06-25 Obtained License
2010-01-23 Lost Circulation Occurred
2010-01-23 Surface Casing Operation Performed
2010-02-10 Direction Drilling Operation Performed - Deviate
2010-02-10 Finished Drilling
2010-02-10 Well Mode changed to Drilled and Cased
2010-02-16 Production Casing Operation Performed
2010-02-16 Rig Released
2010-02-21 Well Log Performed
2010-05-16 Perforation Treatment Performed - Jet Perforation
2010-06-25 Perforation Treatment Performed - Fractured
2010-12-29 Perforation Treatment Performed - Jet Perforation
2011-02-23 Perforation Treatment Performed - Fractured
2011-03-07 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-10 180.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-05-16 Perforation 757.00 760.00 13
2010-06-25 Fracture 433.00 436.00 0
2010-12-29 Perforation 310.90 311.90 13
2010-12-29 Perforation 314.80 315.30 13
2010-12-29 Perforation 299.50 300.00 13
2010-12-29 Perforation 302.90 303.90 13
2010-12-29 Perforation 334.80 335.80 13
2010-12-29 Perforation 337.00 339.00 13
2010-12-29 Perforation 320.10 323.10 13
2010-12-29 Perforation 331.60 332.60 13
2010-12-29 Perforation 295.60 296.10 13
2010-05-16 Perforation 729.00 733.50 13
2010-12-29 Perforation 196.60 197.60 13
2010-12-29 Perforation 209.00 210.00 13
2010-12-29 Perforation 341.50 343.50 13
2010-12-29 Perforation 349.00 350.00 13
2010-12-29 Perforation 259.80 260.30 13
2010-12-29 Perforation 284.00 284.50 13
2010-12-29 Perforation 213.60 214.10 13
2010-12-29 Perforation 251.30 252.30 13
2010-12-29 Perforation 352.90 354.90 13
2010-12-29 Perforation 673.80 674.80 13
2010-05-16 Perforation 726.00 727.00 13
2010-12-29 Perforation 685.30 685.80 13
2010-12-29 Perforation 659.00 660.00 13
2010-12-29 Perforation 669.50 670.00 13
2010-12-29 Perforation 701.00 703.00 13
2010-12-29 Perforation 711.70 712.70 13
2010-12-29 Perforation 693.00 694.00 13
2010-12-29 Perforation 699.10 699.60 13
2010-12-29 Perforation 635.90 636.40 13
2010-12-29 Perforation 459.90 460.90 13
2010-12-29 Perforation 502.00 502.50 13
2010-05-16 Perforation 647.50 648.50 13
2010-12-29 Perforation 418.30 419.30 13
2010-12-29 Perforation 436.50 437.00 13
2010-12-29 Perforation 630.70 631.20 13
2010-12-29 Perforation 521.20 522.20 13
2010-12-29 Perforation 505.70 506.70 13
2010-12-29 Perforation 510.70 511.70 13
2011-02-23 Fracture 341.50 350.00 0
2011-02-23 Fracture 209.00 712.70 0
2010-05-16 Perforation 642.00 644.00 13
2010-05-16 Perforation 433.00 436.00 13
2010-06-25 Fracture 757.00 760.00 0
2010-06-25 Fracture 726.00 733.50 0
2010-06-25 Fracture 642.00 648.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-23 Lost Circulation 28.00 48.00

For data sources see[6]

References