If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254221604020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.123352,"lon":-113.004032,"icon":""}]} |
Location: 02/04-16-025-22W4/0 | |
Location Alias: 02/04-16-25-22 W4M | |
Location Alias 2: 02/04-16-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 16 | |
County/Municipality: Wheatland County | |
Well Name: LONE PINE 102 HZ PARFLESH 4-16-25-22 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0480399 | |
License Date: 2016-09-22 | |
License Status: Issued | |
Spud Date: 2016-10-22 | |
Final Drill Date: 2016-10-27 | |
Well Total Depth: 3131.00 m | |
Surface Hole Latitude: 51.123352 | |
Surface Hole Longitude: -113.004032 |
Date | Event |
---|---|
2016-09-22 | Obtained License |
2016-10-22 | Surface Casing Operation Performed |
2016-10-23 | Direction Drilling Operation Performed - Deviate |
2016-10-24 | Direction Drilling Operation Performed - Horizontal |
2016-10-27 | Finished Drilling |
2016-10-27 | Well Log Performed |
2016-10-27 | Well Mode changed to Drilled and Cased |
2016-10-29 | Production Casing Operation Performed |
2016-10-29 | Rig Released |
2016-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-11-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-24 | Well Began Production |
2017-02-24 | Well Fluid changed to Gas |
2017-02-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-10-22 | Horizon Drilling Inc. | 39 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-10-23 | 1132.80 | Deviate (5 - 79 degrees) |
2016-10-24 | 1763.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-11-17 | Multi-Stage Fracture | 3091.00 | 3091.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 2373.00 | 2373.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 2282.00 | 2282.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 2205.00 | 2205.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 2130.00 | 2130.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 2050.00 | 2050.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 1975.00 | 1975.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 1900.00 | 1900.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 1775.00 | 1775.10 | 0 |
2016-11-17 | Multi-Stage Fracture | 3010.00 | 3010.10 | 0 |
2016-11-17 | Multi-Stage Fracture | 2930.00 | 2930.10 | 0 |
2016-11-17 | Multi-Stage Fracture | 2854.00 | 2854.10 | 0 |
2016-11-17 | Multi-Stage Fracture | 2775.00 | 2775.10 | 0 |
2016-11-17 | Multi-Stage Fracture | 2700.00 | 2700.10 | 0 |
2016-11-17 | Multi-Stage Fracture | 2610.00 | 2610.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 2530.00 | 2530.10 | 0 |
2016-11-18 | Multi-Stage Fracture | 2450.00 | 2450.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-11-17 | 2016-11-18 | 1,481 | 1,010 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.4812 | N/A | |||
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 14.0047 | N/A | ||
SiberProp 20/40 | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.2253 | N/A | ||
Hydrochloric Acid 15% | Baker Hughes | Acid | Hydrochloric acid | 7647-01-0 | 100 | 1.4859 | N/A | |
Water | 7732-18-5 | 100 | 1.4859 | N/A | ||||
AcTivator Oil | Baker Hughes | Activator | Alcohols. C12-14-secondary. ethoxylated | 84133-50-6 | 100 | 0.008 | N/A | |
Hydrodesulfurized kerosine (petroleum) | 64742-81-0 | 100 | 0.008 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.008 | N/A | ||||
Alpha 544 | Baker Hughes | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0127 | N/A | |
Dibromoacetonitrile | 3252-43-5 | 100 | 0.0127 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0127 | N/A | ||||
Sodium Bromide | 7647-15-6 | 100 | 0.0127 | N/A | ||||
Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0204 | N/A | |
CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.11 | N/A | |
Nowferr 12 | Baker Hughes | Corrosion Inhibitor | Methanol | 67-56-1 | 100 | 0.0055 | N/A | |
Non-hazardous | Not Available | 100 | 0.0055 | N/A | ||||
Potassium iodide | 7681-11-0 | 100 | 0.0055 | N/A | ||||
Nowferr 3G | Baker Hughes | Corrosion Inhibitor | 2-Propyn-1-ol. compd w methyloxirane | 38172-91-7 | 100 | 0.0069 | N/A | |
Non-hazardous | Not Available | 100 | 0.0069 | N/A | ||||
Propargyl alcohol | 107-19-7 | 100 | 0.0069 | N/A | ||||
CXB-2 | Baker Hughes | Crosslinker | Methanol | 67-56-1 | 100 | 0.2355 | N/A | |
Non-hazardous | Not Available | 100 | 0.2355 | N/A | ||||
Sodium borate | 7775-19-1 | 100 | 0.2355 | N/A | ||||
Sodium hydroxide | 1310-73-2 | 100 | 0.2355 | N/A | ||||
FP-12L | Baker Hughes | Defoamer | Non-hazardous | Not Available | 100 | 0.0001 | N/A | |
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0001 | N/A | ||||
D-3 | Baker Hughes | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0793 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0793 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0793 | N/A | ||||
Nowferr 10 | Baker Hughes | Demulsifier | Benzene sulphonate derivative | 147732-60-3 | 100 | 0.0224 | N/A | |
Benzenesulphonic acid. C10-16-alkyl derivatives | 68584-22-5 | 100 | 0.0224 | N/A | ||||
Dipropylene glycol | 25265-71-8 | 100 | 0.0224 | N/A | ||||
Non-hazardous | Not Available | 100 | 0.0224 | N/A | ||||
GW-3 | Baker Hughes | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0296 | N/A | |
GW-4 | Baker Hughes | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.2408 | N/A | |
Nowferr 1 | Baker Hughes | Iron Control | Sodium hypophosphite | 10039-56-2 | 100 | 0.0291 | N/A | |
Nowferr 14P | Baker Hughes | Iron Control | Cupric sulphate. pentahydrate | 7758-99-8 | 100 | 0.0017 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-11-15 | 2016-11-15 | Surface Water - Runoff | 203 |
2016-11-15 | 2016-11-15 | Central Water Distribution Facility | 593 |
2016-11-15 | 2016-11-15 | Surface Water - Runoff | 237 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7370 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8746 | 0.0 | 0.0 | 0.0 |
2020 | 2123 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-10-29 | No Incident Encountered | 0.00 | 0.00 |
2016-11-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]