X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254221506020

Well Details

Well ID: 0254221506020
Loading map...
Location: 02/06-15-025-22W4/0
Location Alias: 02/06-15-25-22 W4M
Location Alias 2: 02/06-15-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 15
County/Municipality: Wheatland County
Well Name: ECA ECOG 102 PARFLESH 6-15-25-22
Operator Name: Lynx Energy ULC
License Number: 0413689
License Date: 2009-11-05
License Status: Issued
Spud Date: 2010-02-28
Final Drill Date: 2010-10-07
Well Total Depth: 778.00 m
Surface Hole Latitude: 51.131576
Surface Hole Longitude: -112.994894

For data sources see[1][2]

Well History

Date Event
2009-11-05 Obtained License
2010-02-28 Surface Casing Operation Performed
2010-10-07 Finished Drilling
2010-10-07 Production Casing Operation Performed
2010-10-07 Rig Released
2010-10-07 Well Mode changed to Drilled and Cased
2010-10-11 Well Log Performed
2010-10-29 Perforation Treatment Performed - Jet Perforation
2010-10-29 Well Log Performed
2010-11-11 Perforation Treatment Performed - Fractured
2010-11-19 Well Began Production
2010-11-19 Well Fluid changed to Gas
2010-11-19 Well Mode changed to Flowing
2011-08-14 Perforation Treatment Performed - Jet Perforation
2011-08-23 Perforation Treatment Performed - Fractured
2011-08-30 Well Fluid changed to Coalbed Methane-Coals and Other
2011-08-30 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-29 Perforation 705.00 708.00 13
2010-11-11 Fracture 652.90 653.90 0
2010-11-11 Fracture 639.00 641.00 0
2010-11-11 Fracture 622.00 628.00 0
2010-11-11 Fracture 605.00 606.00 0
2010-11-11 Fracture 573.00 577.00 0
2010-11-11 Fracture 538.00 540.00 0
2011-08-14 Perforation 223.50 224.00 13
2011-08-14 Perforation 229.50 230.00 13
2011-08-14 Perforation 232.20 234.20 13
2011-08-14 Perforation 240.80 241.80 13
2010-10-29 Perforation 652.90 653.90 13
2011-08-14 Perforation 251.00 252.00 13
2011-08-14 Perforation 256.00 257.00 13
2011-08-14 Perforation 259.50 260.50 13
2011-08-14 Perforation 275.00 276.00 13
2011-08-14 Perforation 278.00 280.00 13
2011-08-14 Perforation 333.50 334.50 13
2011-08-14 Perforation 348.00 349.00 13
2011-08-14 Perforation 369.00 370.00 13
2011-08-14 Perforation 407.50 408.00 13
2011-08-14 Perforation 409.30 409.80 13
2010-10-29 Perforation 639.00 641.00 13
2011-08-14 Perforation 446.00 447.00 13
2011-08-14 Perforation 535.80 536.80 13
2011-08-14 Perforation 682.50 683.50 13
2011-08-14 Perforation 694.30 695.30 13
2011-08-14 Perforation 699.00 700.00 13
2011-08-23 Fracture 223.50 700.00 0
2010-10-29 Perforation 627.00 628.00 13
2010-10-29 Perforation 622.00 624.00 13
2010-10-29 Perforation 605.00 606.00 13
2010-10-29 Perforation 573.00 577.00 13
2010-10-29 Perforation 538.00 540.00 13
2010-11-11 Fracture 705.00 708.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1032 0.0 0.0 0.0
2011 8756 0.0 0.0 0.0
2012 8737 0.0 0.0 0.0
2013 8673 0.0 0.0 0.0
2014 8688 0.0 0.0 0.0
2015 8734 0.0 0.0 0.0
2016 8701 0.0 0.0 0.0
2017 8672 0.0 0.0 0.0
2018 8746 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References