X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254220809020

Well Details

Well ID: 0254220809020
Loading map...
Location: 02/09-08-025-22W4/0
Location Alias: 02/09-08-25-22 W4M
Location Alias 2: 02/09-08-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 08
County/Municipality: Wheatland County
Well Name: ECA ECOG 102 PARFLESH 9-8-25-22
Operator Name: Lynx Energy ULC
License Number: 0354832
License Date: 2006-03-29
License Status: Issued
Spud Date: 2007-02-02
Final Drill Date: 2007-02-09
Well Total Depth: 810.00 m
Surface Hole Latitude: 51.118253
Surface Hole Longitude: -113.032770

For data sources see[1][2]

Well History

Date Event
2006-03-29 Obtained License
2007-02-02 Surface Casing Operation Performed
2007-02-09 Finished Drilling
2007-02-09 Production Casing Operation Performed
2007-02-09 Rig Released
2007-02-09 Well Mode changed to Drilled and Cased
2007-02-13 Well Log Performed
2007-02-28 Perforation Treatment Performed - Jet Perforation
2007-03-08 Well Fluid changed to Gas
2007-03-08 Well Mode changed to Testing
2007-05-02 Well Began Production
2007-05-02 Well Fluid changed to Gas
2007-05-02 Well Mode changed to Flowing
2007-07-14 Perforation Treatment Performed - Fractured
2008-06-06 Perforation Treatment Performed - Jet Perforation
2008-07-05 Perforation Treatment Performed - Fractured
2008-08-06 Perforation Treatment Performed - Jet Perforation
2008-08-08 Well Structure changed to Commingled
2008-08-11 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-02-28 Perforation 678.50 680.50 13
2008-06-06 Perforation 294.00 300.00 13
2008-06-06 Perforation 288.00 293.00 13
2008-07-05 Fracture 288.00 300.00 0
2008-08-06 Perforation 733.70 734.20 13
2008-08-06 Perforation 729.30 730.30 13
2008-08-06 Perforation 569.10 569.60 13
2008-08-06 Perforation 560.30 560.80 13
2008-08-06 Perforation 442.60 443.10 13
2008-08-06 Perforation 436.40 436.90 13
2008-08-06 Perforation 401.60 403.60 13
2007-02-28 Perforation 669.00 671.00 13
2008-08-06 Perforation 381.50 382.50 13
2008-08-06 Perforation 307.80 310.80 13
2008-08-06 Perforation 283.60 284.60 13
2008-08-06 Perforation 281.10 281.60 13
2008-08-06 Perforation 270.20 270.70 13
2008-08-06 Perforation 262.10 262.60 13
2008-08-06 Perforation 257.60 259.60 13
2008-08-06 Perforation 254.30 254.80 13
2008-08-06 Perforation 250.60 251.60 13
2008-08-06 Perforation 244.20 244.70 13
2007-02-28 Perforation 666.50 667.50 13
2008-08-06 Perforation 210.50 211.00 13
2008-08-11 Fracture 210.50 734.20 0
2007-02-28 Perforation 612.00 613.00 13
2007-02-28 Perforation 610.00 611.00 13
2007-02-28 Perforation 607.50 609.00 13
2007-07-14 Fracture 678.50 680.50 0
2007-07-14 Fracture 666.50 671.00 0
2007-07-14 Fracture 607.50 613.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 5779 0.0 0.0 0.0
2008 5767 0.0 0.0 0.0

For data sources see[5]

References