X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254220608000

Well Details

Well ID: 0254220608000
Loading map...
Location: 00/08-06-025-22W4/0
Location Alias: 00/08-06-25-22 W4M
Location Alias 2: 00/08-06-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 06
County/Municipality: Wheatland County
Well Name: ECA PARFLESH 8-6-25-22
Operator Name: Lynx Energy ULC
License Number: 0419577
License Date: 2010-04-07
License Status: Issued
Spud Date: 2010-12-05
Final Drill Date: 2010-12-06
Well Total Depth: 770.00 m
Surface Hole Latitude: 51.101046
Surface Hole Longitude: -113.054754

For data sources see[1][2]

Well History

Date Event
2010-04-07 Obtained License
2010-12-05 Surface Casing Operation Performed
2010-12-06 Finished Drilling
2010-12-06 Production Casing Operation Performed
2010-12-06 Rig Released
2010-12-06 Well Mode changed to Drilled and Cased
2010-12-09 Well Log Performed
2011-01-05 Perforation Treatment Performed - Jet Perforation
2011-01-05 Well Log Performed
2011-01-27 Perforation Treatment Performed - Fractured
2011-02-05 Well Began Production
2011-02-05 Well Fluid changed to Gas
2011-02-05 Well Mode changed to Flowing
2011-08-15 Perforation Treatment Performed - Jet Perforation
2011-08-23 Perforation Treatment Performed - Fractured
2011-08-29 Well Fluid changed to Coalbed Methane-Coals and Other
2011-08-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-05 Perforation 699.00 701.00 13
2011-01-27 Fracture 622.00 624.00 0
2011-01-27 Fracture 589.00 591.00 0
2011-01-27 Fracture 569.00 570.00 0
2011-01-27 Fracture 538.00 541.00 0
2011-08-15 Perforation 213.90 215.90 13
2011-08-15 Perforation 218.40 219.40 13
2011-08-15 Perforation 222.20 223.20 13
2011-08-15 Perforation 231.50 233.50 13
2011-08-15 Perforation 241.80 242.80 13
2011-08-15 Perforation 243.70 244.70 13
2011-01-05 Perforation 668.00 669.00 13
2011-08-15 Perforation 265.20 266.20 13
2011-08-15 Perforation 272.40 273.40 13
2011-08-15 Perforation 284.00 288.00 13
2011-08-15 Perforation 325.20 326.20 13
2011-08-15 Perforation 339.80 340.80 13
2011-08-15 Perforation 359.60 360.60 13
2011-08-15 Perforation 402.30 403.30 13
2011-08-15 Perforation 416.20 416.70 13
2011-08-15 Perforation 688.00 689.00 13
2011-08-15 Perforation 691.50 692.50 13
2011-01-05 Perforation 622.00 624.00 13
2011-08-23 Fracture 213.90 692.50 0
2011-01-05 Perforation 589.00 591.00 13
2011-01-05 Perforation 569.00 570.00 13
2011-01-05 Perforation 538.00 541.00 13
2011-01-05 Perforation 524.00 525.00 13
2011-01-27 Fracture 699.00 701.00 0
2011-01-27 Fracture 668.00 669.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7919 0.0 0.0 0.0
2012 8771 0.0 0.0 0.0
2013 8709 0.0 0.0 0.0
2014 8721 0.0 0.0 0.0
2015 8605 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8577 0.0 0.0 0.0
2018 8748 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References