X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254213010002

Well Details

Well ID: 0254213010002
Loading map...
Location: 00/10-30-025-21W4/2
Location Alias: 00/10-30-25-21 W4M
Location Alias 2: 00/10-30-025-21 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 21
Section: 30
County/Municipality: Wheatland County
Well Name: PCP HUSSAR 10-30-25-21
Operator Name: Lynx Energy ULC
License Number: 0164841
License Date: 1994-02-08
License Status: Amended
Spud Date: 1994-02-22
Final Drill Date: 1994-03-04
Well Total Depth: 1605.00 m
Surface Hole Latitude: 51.162158
Surface Hole Longitude: -112.920968

For data sources see[1][2]

Well History

Date Event
1994-02-08 Obtained License
1994-02-23 Surface Casing Operation Performed
1994-02-27 Well Log Performed
1994-03-03 Well Log Performed
1994-03-04 Drill Stem Test Performed
1994-03-04 Finished Drilling
1994-03-04 Well Mode changed to Drilled and Cased
1994-03-05 Production Casing Operation Performed
1994-03-05 Rig Released
1994-03-17 Well Log Performed
1994-03-18 Well Log Performed
1994-03-19 Perforation Treatment Performed - Jet Perforation
1994-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-23 Well Log Performed
1994-03-24 Perforation Treatment Performed - Jet Perforation
1994-03-27 Perforation Treatment Performed - Fractured
1994-03-29 Well Log Performed
1994-04-15 Well Log Performed
1994-04-23 Well Log Performed
1994-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-30 Well Log Performed
1994-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-02 Perforation Treatment Performed - Jet Perforation
1994-05-04 Perforation Treatment Performed - Fractured
2005-01-22 Well Log Performed
2005-03-01 Perforation Treatment Performed - Jet Perforation
2005-04-28 Perforation Treatment Performed - Fractured
2005-05-14 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-14 Well Mode changed to Testing
2007-08-23 Well Began Production
2007-08-23 Well Fluid changed to Coalbed Methane-Coals Only
2007-08-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-19 Perforation 1567.00 1571.00 13
1994-05-02 Perforation 673.00 676.00 13
1994-05-04 Fracture 635.00 676.00 0
2005-03-01 Perforation 473.50 474.50 13
2005-03-01 Perforation 434.00 435.00 13
2005-03-01 Perforation 415.10 416.10 13
2005-03-01 Perforation 396.20 397.20 13
2005-03-01 Perforation 346.60 347.60 13
2005-03-01 Perforation 344.50 345.50 13
2005-03-01 Perforation 321.00 323.00 13
2005-03-01 Perforation 311.90 312.90 13
1994-03-21 Acid Treatment 1567.00 1571.00 0
2005-03-01 Perforation 306.30 307.30 13
2005-03-01 Perforation 303.00 304.00 13
2005-03-01 Perforation 300.20 301.20 13
2005-03-01 Perforation 295.40 296.40 13
2005-03-01 Perforation 256.50 257.50 13
2005-03-01 Perforation 245.40 246.40 13
2005-03-01 Perforation 208.90 209.90 13
2005-04-28 Fracture 208.90 474.50 0
1994-03-24 Perforation 1311.00 1314.00 13
1994-03-24 Perforation 1316.00 1318.00 13
1994-03-24 Perforation 1322.00 1325.50 13
1994-03-27 Fracture 1311.00 1325.50 0
1994-04-25 Packing Device Capped w/Cement 1525.00 1555.00 0
1994-05-01 Packing Device Capped w/Cement 1292.00 1300.00 0
1994-05-02 Perforation 635.00 641.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3 0.0 0.0 0.0
2007 877 0.0 0.0 0.0
2008 3327 0.0 0.0 0.0
2009 7027 0.0 0.0 0.0
2010 7294 0.0 0.0 0.0
2011 7209 0.0 0.0 0.0
2012 7444 0.0 0.0 0.0
2013 6521 0.0 0.0 0.0
2014 6611 0.0 0.0 0.0
2015 8214 0.0 0.0 0.0
2016 8312 0.0 0.0 0.0
2017 8520 0.0 0.0 0.0
2018 8496 0.0 0.0 0.0
2019 8742 0.0 0.0 0.0
2020 1998 0.0 0.0 0.0

For data sources see[5]

References