X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254200902000

Well Details

Well ID: 0254200902000
Loading map...
Location: 00/02-09-025-20W4/0
Location Alias: 00/02-09-25-20 W4M
Location Alias 2: 00/02-09-025-20 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 20
Section: 09
County/Municipality: Wheatland County
Well Name: BVI HUSSAR 2-9-25-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0027387
License Date: 1964-12-21
License Status: RecCertified
Spud Date: 1964-12-22
Final Drill Date: 1965-01-06
Well Total Depth: 1472.20 m
Surface Hole Latitude: 51.112537
Surface Hole Longitude: -112.734706

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-21 Obtained License
1965-01-01 Drill Stem Test Performed
1965-01-06 Drill Stem Test Performed
1965-01-06 Finished Drilling
1965-01-07 Drill Stem Test Performed
1965-01-08 Drill Stem Test Performed
1965-01-09 Drill Stem Test Performed
1965-01-10 Drill Stem Test Performed
1965-01-11 Production Casing Operation Performed
1965-08-16 Well Mode changed to Drilled and Cased
1973-11-10 Perforation Treatment Performed - Jet Perforation
1973-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-13 Perforation Treatment Performed - Jet Perforation
1973-11-16 Perforation Treatment Performed - Jet Perforation
1974-12-11 Well Began Production
1974-12-11 Well Fluid changed to Gas
1974-12-11 Well Mode changed to Flowing
1978-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-03 Perforation Treatment Performed - Jet Perforation
1978-08-03 Well Abandoned
1978-08-03 Well Fluid changed to Gas
1978-08-03 Well Mode changed to Abandoned Zone
1979-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-06-11 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-11-10 Perforation 1410.90 1412.70 7
1973-11-12 Acid Treatment 1410.90 1412.70 0
1973-11-13 Perforation 1420.40 1422.20 7
1973-11-16 Perforation 1425.20 1426.20 13
1978-08-03 Packing Device Capped w/Cement 1394.50 1402.10 0
1978-08-03 Perforation 1194.50 1197.60 7
1979-06-11 Packing Device Capped w/Cement 1100.00 1100.00 0
1979-06-11 Cement Plug 28.00 143.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 487 0.0 0.0 0.0
1975 8022 0.0 0.0 0.0
1976 7463 0.0 0.0 0.0
1977 169 0.0 0.0 0.0

For data sources see[5]

References