If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254200902000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.112537,"lon":-112.734706,"icon":""}]} |
Location: 00/02-09-025-20W4/0 | |
Location Alias: 00/02-09-25-20 W4M | |
Location Alias 2: 00/02-09-025-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 20 | |
Section: 09 | |
County/Municipality: Wheatland County | |
Well Name: BVI HUSSAR 2-9-25-20 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0027387 | |
License Date: 1964-12-21 | |
License Status: RecCertified | |
Spud Date: 1964-12-22 | |
Final Drill Date: 1965-01-06 | |
Well Total Depth: 1472.20 m | |
Surface Hole Latitude: 51.112537 | |
Surface Hole Longitude: -112.734706 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-12-21 | Obtained License |
1965-01-01 | Drill Stem Test Performed |
1965-01-06 | Drill Stem Test Performed |
1965-01-06 | Finished Drilling |
1965-01-07 | Drill Stem Test Performed |
1965-01-08 | Drill Stem Test Performed |
1965-01-09 | Drill Stem Test Performed |
1965-01-10 | Drill Stem Test Performed |
1965-01-11 | Production Casing Operation Performed |
1965-08-16 | Well Mode changed to Drilled and Cased |
1973-11-10 | Perforation Treatment Performed - Jet Perforation |
1973-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-11-13 | Perforation Treatment Performed - Jet Perforation |
1973-11-16 | Perforation Treatment Performed - Jet Perforation |
1974-12-11 | Well Began Production |
1974-12-11 | Well Fluid changed to Gas |
1974-12-11 | Well Mode changed to Flowing |
1978-08-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-08-03 | Perforation Treatment Performed - Jet Perforation |
1978-08-03 | Well Abandoned |
1978-08-03 | Well Fluid changed to Gas |
1978-08-03 | Well Mode changed to Abandoned Zone |
1979-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-06-11 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-11-10 | Perforation | 1410.90 | 1412.70 | 7 |
1973-11-12 | Acid Treatment | 1410.90 | 1412.70 | 0 |
1973-11-13 | Perforation | 1420.40 | 1422.20 | 7 |
1973-11-16 | Perforation | 1425.20 | 1426.20 | 13 |
1978-08-03 | Packing Device Capped w/Cement | 1394.50 | 1402.10 | 0 |
1978-08-03 | Perforation | 1194.50 | 1197.60 | 7 |
1979-06-11 | Packing Device Capped w/Cement | 1100.00 | 1100.00 | 0 |
1979-06-11 | Cement Plug | 28.00 | 143.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1974 | 487 | 0.0 | 0.0 | 0.0 |
1975 | 8022 | 0.0 | 0.0 | 0.0 |
1976 | 7463 | 0.0 | 0.0 | 0.0 |
1977 | 169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]