X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254123203000

Well Details

Well ID: 0254123203000
Loading map...
Location: 00/03-32-025-12W4/0
Location Alias: 00/03-32-25-12 W4M
Location Alias 2: 00/03-32-025-12 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 12
Section: 32
County/Municipality: Special Areas No. 2
Well Name: AMOCO CESSFORD 3-32-25-12
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0056385
License Date: 1975-12-30
License Status: RecCertified
Spud Date: 1976-01-07
Final Drill Date: 1976-01-13
Well Total Depth: 1063.80 m
Surface Hole Latitude: 51.171695
Surface Hole Longitude: -111.649559

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-30 Obtained License
1976-01-13 Finished Drilling
1976-01-13 Well Mode changed to Drilled and Cased
1976-01-14 Drill Stem Test Performed
1976-01-15 Production Casing Operation Performed
1976-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-27 Perforation Treatment Performed - Cement Squeeze
1976-02-27 Perforation Treatment Performed - Jet Perforation
1976-03-05 Perforation Treatment Performed - Jet Perforation
1976-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-08 Perforation Treatment Performed - Jet Perforation
1976-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-23 Well Began Production
1976-03-23 Well Fluid changed to Crude Oil
1976-03-23 Well Mode changed to Pumping
1979-11-01 Well Fluid changed to Crude Oil
1979-11-01 Well Mode changed to Suspended
1991-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-06 Plug Back Performed
1991-09-06 Well Fluid changed to Crude Oil
1991-09-06 Well Mode changed to Abandoned
1991-09-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-27 Perforation 1025.30 1027.20 13
1976-02-27 Acid Treatment 1025.30 1027.20 0
1976-02-27 Cement Squeeze 1025.30 1027.20 0
1976-03-05 Perforation 1021.40 1021.40 0
1976-03-07 Acid Treatment 1021.40 1021.40 0
1976-03-08 Perforation 1020.80 1023.50 13
1976-03-10 Acid Treatment 1020.80 1023.50 0
1991-09-06 Packing Device Capped w/Cement 1000.00 1008.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6549 0.0 0.0 0.0
1977 8616 0.0 0.0 0.0
1978 7747 0.0 0.0 0.0
1979 5567 0.0 0.0 0.0

For data sources see[5]

References