X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254082307003

Well Details

Well ID: 0254082307003
Loading map...
Location: 00/07-23-025-08W4/3
Location Alias: 00/07-23-25-08 W4M
Location Alias 2: 00/07-23-025-08 W4/03
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 08
Section: 23
County/Municipality: Special Areas No. 3
Well Name: EOG JOLIET 7-23-25-8
Operator Name: Canadian Natural Resources Limited
License Number: 0240578
License Date: 2000-08-08
License Status: Abandoned
Spud Date: 2000-08-26
Final Drill Date: 2000-08-29
Well Total Depth: 1038.00 m
Surface Hole Latitude: 51.143216
Surface Hole Longitude: -111.013601

For data sources see[1][2]

Well History

Date Event
2000-08-08 Obtained License
2000-08-27 Surface Casing Operation Performed
2000-08-29 Finished Drilling
2000-08-29 Well Log Performed
2000-08-29 Well Mode changed to Drilled and Cased
2000-08-30 Production Casing Operation Performed
2000-08-30 Rig Released
2000-09-13 Perforation Treatment Performed - Jet Perforation
2000-09-14 Well Log Performed
2000-09-20 Perforation Treatment Performed - Fractured
2000-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-28 Plug Back Performed
2000-09-28 Well Log Performed
2000-09-30 Perforation Treatment Performed - Jet Perforation
2000-09-30 Well Log Performed
2000-10-06 Perforation Treatment Performed - Fractured
2000-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-30 Perforation Treatment Performed - Jet Perforation
2000-10-30 Plug Back Performed
2000-12-07 Perforation Treatment Performed - Jet Perforation
2000-12-08 Perforation Treatment Performed - Cement Squeeze
2001-01-31 Perforation Treatment Performed - Jet Perforation
2001-02-17 Well Fluid changed to Gas
2001-02-17 Well Mode changed to Testing
2001-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-18 Plug Back Performed
2001-02-18 Well Fluid changed to Gas
2001-02-18 Well Mode changed to Abandoned Zone
2001-02-21 Perforation Treatment Performed - Jet Perforation
2008-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-06 Plug Back Performed
2008-11-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-13 Perforation 1013.00 1016.00 7
2000-12-08 Cement Squeeze 859.00 860.00 0
2000-12-08 Cement Squeeze 883.00 884.00 0
2001-01-31 Perforation 834.70 835.70 7
2001-02-18 Packing Device Capped w/Cement 822.00 830.00 0
2001-02-21 Perforation 303.00 303.50 13
2001-02-21 Perforation 294.00 296.00 13
2008-11-06 Packing Device Capped w/Cement 282.00 291.00 0
2000-09-20 Fracture 1013.00 1016.00 0
2000-09-28 Packing Device Capped w/Cement 1005.00 1013.00 0
2000-09-30 Perforation 925.00 927.00 13
2000-10-06 Fracture 925.00 927.00 0
2000-10-30 Packing Device Capped w/Cement 912.00 920.00 0
2000-10-30 Perforation 835.00 836.00 13
2000-12-07 Perforation 883.00 884.00 13
2000-12-07 Perforation 859.00 860.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1 0.0 0.0 0.0

For data sources see[5]

References