If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254062606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.158405,"lon":-110.738236,"icon":""}]} |
Location: 00/06-26-025-06W4/0 | |
Location Alias: 00/06-26-25-06 W4M | |
Location Alias 2: 00/06-26-025-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 06 | |
Section: 26 | |
County/Municipality: Special Areas No. 3 | |
Well Name: RTOG ET AL HELMSDALE 6-26-25-6 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0063343 | |
License Date: 1977-03-29 | |
License Status: RecCertified | |
Spud Date: 1977-04-18 | |
Final Drill Date: 1977-04-23 | |
Well Total Depth: 1025.70 m | |
Surface Hole Latitude: 51.158405 | |
Surface Hole Longitude: -110.738236 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-03-29 | Obtained License |
1977-04-18 | Lost Circulation Occurred |
1977-04-23 | Drill Stem Test Performed |
1977-04-23 | Finished Drilling |
1977-04-24 | Drill Stem Test Performed |
1977-04-24 | Production Casing Operation Performed |
1977-04-25 | Well Mode changed to Drilled and Cased |
1981-11-04 | Perforation Treatment Performed - Jet Perforation |
1998-01-08 | Well Began Production |
1998-01-08 | Well Fluid changed to Gas |
1998-01-08 | Well Mode changed to Flowing |
2003-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-18 | Plug Back Performed |
2003-03-18 | Well Fluid changed to Gas |
2003-03-18 | Well Mode changed to Abandoned Zone |
2003-03-25 | Well Abandoned |
2003-03-25 | Well Fluid changed to Gas |
2003-03-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-11-04 | Perforation | 995.00 | 998.00 | 13 |
2003-03-18 | Packing Device Capped w/Cement | 982.00 | 990.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 929 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1977-04-18 | Lost Circulation | 30.50 | 61.00 |
For data sources see[6]