X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244273402000

Well Details

Well ID: 0244273402000
Loading map...
Location: 00/02-34-024-27W4/0
Location Alias: 00/02-34-24-27 W4M
Location Alias 2: 00/02-34-024-27 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 34
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 2-34-24-27
Operator Name: Ember Resources Inc.
License Number: 0330659
License Date: 2005-05-09
License Status: Issued
Spud Date: 2005-05-10
Final Drill Date: 2005-05-26
Well Total Depth: 853.00 m
Surface Hole Latitude: 51.082451
Surface Hole Longitude: -113.688584

For data sources see[1][2]

Well History

Date Event
2005-05-09 Obtained License
2005-05-10 Surface Casing Operation Performed
2005-05-26 Finished Drilling
2005-05-26 Production Casing Operation Performed
2005-05-26 Rig Released
2005-05-26 Well Mode changed to Drilled and Cased
2005-05-29 Well Log Performed
2005-06-27 Perforation Treatment Performed - Jet Perforation
2005-07-11 Perforation Treatment Performed - Fractured
2006-11-29 Well Began Production
2006-11-29 Well Fluid changed to Coalbed Methane-Coals Only
2006-11-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-27 Perforation 730.70 731.20 13
2005-06-27 Perforation 594.30 594.80 13
2005-06-27 Perforation 586.70 587.20 13
2005-06-27 Perforation 581.10 581.60 13
2005-06-27 Perforation 571.30 571.80 13
2005-06-27 Perforation 564.10 564.60 13
2005-06-27 Perforation 562.90 563.40 13
2005-06-27 Perforation 558.30 558.80 13
2005-06-27 Perforation 552.60 553.10 13
2005-06-27 Perforation 549.20 549.70 13
2005-06-27 Perforation 480.80 481.30 13
2005-06-27 Perforation 728.40 728.90 13
2005-06-27 Perforation 440.90 441.40 13
2005-06-27 Perforation 435.80 436.30 13
2005-06-27 Perforation 429.70 430.20 13
2005-06-27 Perforation 426.20 426.70 13
2005-06-27 Perforation 417.50 418.00 13
2005-06-27 Perforation 383.70 384.20 13
2005-06-27 Perforation 358.70 359.20 13
2005-06-27 Perforation 311.10 311.60 13
2005-06-27 Perforation 307.80 308.30 13
2005-06-27 Perforation 304.20 304.70 13
2005-06-27 Perforation 689.20 689.70 13
2005-06-27 Perforation 288.90 289.40 13
2005-07-11 Fracture 288.90 731.20 0
2005-06-27 Perforation 684.10 684.60 13
2005-06-27 Perforation 676.90 677.40 13
2005-06-27 Perforation 667.30 667.80 13
2005-06-27 Perforation 614.30 614.80 13
2005-06-27 Perforation 612.80 613.30 13
2005-06-27 Perforation 596.00 596.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 765 0.0 0.0 0.0
2007 8529 0.0 0.0 0.0
2008 8707 0.0 0.0 0.0
2009 8729 0.0 0.0 0.0
2010 8577 0.0 0.0 0.0
2011 8630 0.0 0.0 0.0
2012 4320 0.0 0.0 0.0
2013 8716 0.0 0.0 0.0
2014 8713 0.0 0.0 0.0
2015 8758 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References