If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244272712000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.075128,"lon":-113.701769,"icon":""}]} |
Location: 00/12-27-024-27W4/0 | |
Location Alias: 00/12-27-24-27 W4M | |
Location Alias 2: 00/12-27-024-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 27 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 12-27-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0228669 | |
License Date: 1999-11-13 | |
License Status: Issued | |
Spud Date: 1999-11-15 | |
Final Drill Date: 1999-11-21 | |
Well Total Depth: 1160.00 m | |
Surface Hole Latitude: 51.075128 | |
Surface Hole Longitude: -113.701769 |
Date | Event |
---|---|
1999-11-13 | Obtained License |
1999-11-15 | Surface Casing Operation Performed |
1999-11-21 | Finished Drilling |
1999-11-21 | Production Casing Operation Performed |
1999-11-22 | Rig Released |
1999-11-22 | Well Mode changed to Drilled and Cased |
1999-12-07 | Well Log Performed |
1999-12-13 | Perforation Treatment Performed - Jet Perforation |
2000-11-29 | Well Began Production |
2000-11-29 | Well Fluid changed to Gas |
2000-11-29 | Well Mode changed to Flowing |
2007-01-01 | Well Fluid changed to Gas |
2007-01-01 | Well Mode changed to Suspended |
2007-01-19 | Perforation Treatment Performed - Fractured |
2007-01-26 | Well Fluid changed to Gas |
2007-01-26 | Well Mode changed to Flowing |
2009-08-25 | Perforation Treatment Performed - Jet Perforation |
2009-09-04 | Perforation Treatment Performed - Fractured |
2009-09-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-09-16 | Well Mode changed to Flowing |
2009-11-09 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-12-13 | Perforation | 823.00 | 826.00 | 7 |
2009-08-25 | Perforation | 496.00 | 498.00 | 13 |
2009-08-25 | Perforation | 432.00 | 434.00 | 13 |
2009-08-25 | Perforation | 402.00 | 403.00 | 13 |
2009-08-25 | Perforation | 311.90 | 312.40 | 13 |
2009-08-25 | Perforation | 658.00 | 660.00 | 13 |
2009-08-25 | Perforation | 558.00 | 558.50 | 13 |
2009-08-25 | Perforation | 567.80 | 568.30 | 13 |
2009-08-25 | Perforation | 700.10 | 701.10 | 13 |
2009-08-25 | Perforation | 697.50 | 698.00 | 13 |
2009-08-25 | Perforation | 693.20 | 694.20 | 13 |
2007-01-19 | Fracture | 823.00 | 826.00 | 0 |
2009-08-25 | Perforation | 746.10 | 746.60 | 13 |
2009-08-25 | Perforation | 743.70 | 744.20 | 13 |
2009-08-25 | Perforation | 702.70 | 703.20 | 13 |
2009-08-25 | Perforation | 678.60 | 680.60 | 13 |
2009-08-25 | Perforation | 606.40 | 606.90 | 13 |
2009-08-25 | Perforation | 581.50 | 582.00 | 13 |
2009-08-25 | Perforation | 573.60 | 575.60 | 13 |
2009-08-25 | Perforation | 624.00 | 624.50 | 13 |
2009-08-25 | Perforation | 633.30 | 633.80 | 13 |
2009-08-25 | Perforation | 625.40 | 625.90 | 13 |
2009-08-25 | Perforation | 438.20 | 439.20 | 13 |
2009-09-04 | Fracture | 402.00 | 660.00 | 0 |
2009-09-04 | Fracture | 311.90 | 746.60 | 0 |
2009-08-25 | Perforation | 394.50 | 395.00 | 13 |
2009-08-25 | Perforation | 368.80 | 369.30 | 13 |
2009-08-25 | Perforation | 559.50 | 560.50 | 13 |
2009-08-25 | Perforation | 452.80 | 453.80 | 13 |
2009-08-25 | Perforation | 445.30 | 446.30 | 13 |
2009-08-25 | Perforation | 320.60 | 322.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 792 | 0.0 | 0.0 | 0.0 |
2001 | 8680 | 0.0 | 0.0 | 0.0 |
2002 | 8756 | 0.0 | 0.0 | 0.0 |
2003 | 8672 | 0.0 | 0.0 | 0.0 |
2004 | 8001 | 0.0 | 0.0 | 0.0 |
2005 | 8472 | 0.0 | 0.0 | 0.0 |
2006 | 4301 | 0.0 | 0.0 | 0.0 |
2007 | 7983 | 0.0 | 0.0 | 0.0 |
2008 | 8040 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8735 | 0.0 | 0.0 | 0.0 |
2012 | 4964 | 0.0 | 0.0 | 0.0 |
2013 | 8743 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8718 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8559 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[5]