X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244271916000

Well Details

Well ID: 0244271916000
Loading map...
Location: 00/16-19-024-27W4/0
Location Alias: 00/16-19-24-27 W4M
Location Alias 2: 00/16-19-024-27 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 19
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 16-19-24-27
Operator Name: Ember Resources Inc.
License Number: 0415537
License Date: 2009-12-14
License Status: Issued
Spud Date: 2010-02-10
Final Drill Date: 2010-02-11
Well Total Depth: 1429.00 m
Surface Hole Latitude: 51.059056
Surface Hole Longitude: -113.759573

For data sources see[1][2]

Well History

Date Event
2009-12-14 Obtained License
2010-02-10 Surface Casing Operation Performed
2010-02-11 Direction Drilling Operation Performed - Deviate
2010-02-11 Finished Drilling
2010-02-11 Well Mode changed to Drilled and Cased
2010-02-12 Production Casing Operation Performed
2010-02-12 Rig Released
2010-02-20 Well Log Performed
2010-04-05 Perforation Treatment Performed - Jet Perforation
2010-07-29 Perforation Treatment Performed - Fractured
2010-08-04 Well Fluid changed to Gas
2010-08-04 Well Mode changed to Testing
2010-08-19 Perforation Treatment Performed - Jet Perforation
2010-08-23 Perforation Treatment Performed - Fractured
2010-09-01 Well Structure changed to Commingled
2010-10-07 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-11 6.10 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-05 Perforation 357.50 360.50 13
2010-08-19 Perforation 602.70 603.20 13
2010-08-19 Perforation 600.10 601.10 13
2010-08-19 Perforation 550.80 551.30 13
2010-08-19 Perforation 611.20 611.70 13
2010-08-19 Perforation 767.00 767.50 13
2010-08-19 Perforation 766.10 766.60 13
2010-08-19 Perforation 679.90 680.40 13
2010-08-19 Perforation 926.10 927.10 13
2010-08-19 Perforation 661.80 663.80 13
2010-08-19 Perforation 630.00 631.00 13
2010-07-29 Fracture 357.50 360.50 0
2010-08-19 Perforation 478.00 481.00 13
2010-08-19 Perforation 671.80 672.80 13
2010-08-19 Perforation 1077.50 1080.50 13
2010-08-19 Perforation 759.00 761.00 13
2010-08-19 Perforation 688.00 690.00 13
2010-08-19 Perforation 936.40 936.90 13
2010-08-19 Perforation 932.10 933.10 13
2010-08-19 Perforation 930.20 930.70 13
2010-08-19 Perforation 958.90 959.40 13
2010-08-19 Perforation 413.00 416.00 13
2010-08-19 Perforation 818.60 819.60 13
2010-08-19 Perforation 983.60 984.10 13
2010-08-23 Fracture 550.80 984.10 0
2010-08-23 Fracture 413.00 1080.50 0
2010-08-19 Perforation 781.10 781.60 13
2010-08-19 Perforation 774.80 775.30 13
2010-08-19 Perforation 820.50 821.00 13
2010-08-19 Perforation 923.90 924.40 13
2010-08-19 Perforation 908.30 910.30 13
2010-08-19 Perforation 840.60 841.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4 0.0 0.0 0.0

For data sources see[6]

References