X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244271305000

Well Details

Well ID: 0244271305000
Loading map...
Location: 00/05-13-024-27W4/0
Location Alias: 00/05-13-24-27 W4M
Location Alias 2: 00/05-13-024-27 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 13
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 5-13-24-27
Operator Name: Ember Resources Inc.
License Number: 0341073
License Date: 2005-10-26
License Status: Issued
Spud Date: 2005-12-22
Final Drill Date: 2005-12-30
Well Total Depth: 849.00 m
Surface Hole Latitude: 51.044744
Surface Hole Longitude: -113.655451

For data sources see[1][2]

Well History

Date Event
2005-10-26 Obtained License
2005-12-22 Surface Casing Operation Performed
2005-12-30 Finished Drilling
2005-12-30 Well Mode changed to Drilled and Cased
2005-12-31 Production Casing Operation Performed
2005-12-31 Rig Released
2006-01-03 Well Log Performed
2006-01-20 Perforation Treatment Performed - Jet Perforation
2006-02-11 Well Fluid changed to Gas
2006-02-11 Well Mode changed to Testing
2006-02-13 Well Began Production
2006-02-13 Well Fluid changed to Gas
2006-02-13 Well Mode changed to Flowing
2009-02-09 Perforation Treatment Performed - Jet Perforation
2009-03-02 Perforation Treatment Performed - Fractured
2009-03-13 Well Fluid changed to Gas
2009-03-13 Well Mode changed to Flowing
2009-09-22 Well Log Performed
2010-08-05 Perforation Treatment Performed - Jet Perforation
2010-08-11 Perforation Treatment Performed - Fractured
2010-09-02 Well Fluid changed to Gas
2010-09-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-20 Perforation 801.50 803.50 13
2009-03-02 Fracture 598.00 601.00 0
2010-08-05 Perforation 542.60 543.10 13
2010-08-05 Perforation 538.40 538.90 13
2010-08-05 Perforation 531.80 532.80 13
2010-08-05 Perforation 570.00 570.50 13
2010-08-05 Perforation 550.80 551.30 13
2010-08-05 Perforation 545.00 545.50 13
2010-08-05 Perforation 337.00 337.50 13
2010-08-05 Perforation 289.40 290.40 13
2010-08-05 Perforation 283.60 284.60 13
2009-02-09 Perforation 306.50 308.50 13
2010-08-05 Perforation 419.90 420.40 13
2010-08-05 Perforation 406.00 406.50 13
2010-08-05 Perforation 398.20 398.70 13
2010-08-05 Perforation 714.20 714.70 13
2010-08-05 Perforation 672.20 672.70 13
2010-08-05 Perforation 717.50 718.00 13
2010-08-05 Perforation 787.50 789.50 13
2010-08-05 Perforation 231.00 234.00 13
2010-08-05 Perforation 667.60 669.60 13
2010-08-05 Perforation 591.40 591.90 13
2009-02-09 Perforation 429.00 431.00 13
2010-08-05 Perforation 577.70 578.70 13
2010-08-05 Perforation 594.70 595.20 13
2010-08-05 Perforation 663.60 664.10 13
2010-08-05 Perforation 650.80 652.80 13
2010-08-11 Fracture 283.60 718.00 0
2010-08-11 Fracture 231.00 789.50 0
2009-02-09 Perforation 253.00 256.00 13
2009-02-09 Perforation 285.50 287.50 13
2009-02-09 Perforation 598.00 601.00 13
2009-02-09 Perforation 561.50 564.50 13
2009-02-09 Perforation 464.00 466.00 13
2009-03-02 Fracture 253.00 564.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7750 0.0 0.0 0.0
2007 7636 0.0 0.0 0.0
2008 8183 0.0 0.0 0.0
2009 8165 0.0 0.0 0.0
2010 5936 0.0 0.0 0.0
2011 8218 0.0 0.0 0.0
2012 7321 0.0 0.0 0.0
2013 3423 0.0 0.0 0.0
2014 2681 0.0 0.0 0.0
2015 7510 0.0 0.0 0.0
2016 8342 0.0 0.0 0.0
2017 7888 0.0 0.0 0.0
2018 8051 0.0 0.0 0.0
2019 7808 0.0 0.0 0.0
2020 2078 0.0 0.0 0.0

For data sources see[5]

References