X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244270815000

Well Details

Well ID: 0244270815000
Loading map...
Location: 00/15-08-024-27W4/0
Location Alias: 00/15-08-24-27 W4M
Location Alias 2: 00/15-08-024-27 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 08
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 15-8-24-27
Operator Name: Ember Resources Inc.
License Number: 0393554
License Date: 2008-02-04
License Status: Amended
Spud Date: 2008-02-12
Final Drill Date: 2008-02-13
Well Total Depth: 1270.00 m
Surface Hole Latitude: 51.030006
Surface Hole Longitude: -113.726878

For data sources see[1][2]

Well History

Date Event
2008-02-04 Obtained License
2008-02-12 Direction Drilling Operation Performed - Deviate
2008-02-12 Surface Casing Operation Performed
2008-02-13 Finished Drilling
2008-02-13 Well Mode changed to Drilled and Cased
2008-02-14 Production Casing Operation Performed
2008-02-14 Rig Released
2008-02-20 Well Log Performed
2008-03-02 Perforation Treatment Performed - Jet Perforation
2008-03-06 Perforation Treatment Performed - Jet Perforation
2008-05-14 Perforation Treatment Performed - Fractured
2008-07-15 Well Began Production
2008-07-15 Well Fluid changed to Gas
2008-07-15 Well Mode changed to Flowing
2010-01-11 Perforation Treatment Performed - Jet Perforation
2010-01-25 Perforation Treatment Performed - Fractured
2010-01-29 Well Structure changed to Commingled
2010-03-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-12 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-03-02 Perforation 941.50 944.50 13
2010-01-11 Perforation 442.80 443.80 13
2010-01-11 Perforation 405.30 405.80 13
2010-01-11 Perforation 505.30 506.30 13
2010-01-11 Perforation 775.00 776.00 13
2010-01-11 Perforation 655.50 656.00 13
2010-01-11 Perforation 998.80 999.80 13
2010-01-11 Perforation 974.30 976.30 13
2010-01-11 Perforation 1002.50 1003.00 13
2010-01-11 Perforation 1059.20 1059.70 13
2010-01-11 Perforation 1003.90 1006.90 13
2008-03-06 Perforation 845.00 848.00 13
2010-01-11 Perforation 898.10 899.10 13
2010-01-11 Perforation 804.70 805.20 13
2010-01-11 Perforation 796.50 797.00 13
2010-01-11 Perforation 795.00 795.50 13
2010-01-11 Perforation 866.40 866.90 13
2010-01-11 Perforation 893.90 894.40 13
2010-01-25 Fracture 405.30 405.80 0
2010-01-25 Fracture 442.80 776.00 0
2010-01-25 Fracture 413.80 1059.70 0
2008-05-14 Fracture 845.00 848.00 0
2010-01-11 Perforation 497.00 497.50 13
2010-01-11 Perforation 425.90 426.90 13
2010-01-11 Perforation 597.30 600.30 13
2010-01-11 Perforation 638.60 640.60 13
2010-01-11 Perforation 637.40 637.90 13
2010-01-11 Perforation 413.80 414.30 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4072 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 744 0.0 0.0 0.0

For data sources see[6]

References