If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244263415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.092379,"lon":-113.545609,"icon":""}]} |
Location: 00/15-34-024-26W4/0 | |
Location Alias: 00/15-34-24-26 W4M | |
Location Alias 2: 00/15-34-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 15-34-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0430041 | |
License Date: 2011-01-14 | |
License Status: Issued | |
Spud Date: 2011-09-05 | |
Final Drill Date: 2011-09-06 | |
Well Total Depth: 1051.00 m | |
Surface Hole Latitude: 51.092379 | |
Surface Hole Longitude: -113.545609 |
Date | Event |
---|---|
2011-01-14 | Obtained License |
2011-09-05 | Direction Drilling Operation Performed - Deviate |
2011-09-05 | Surface Casing Operation Performed |
2011-09-06 | Finished Drilling |
2011-09-06 | Production Casing Operation Performed |
2011-09-06 | Rig Released |
2011-09-06 | Well Mode changed to Drilled and Cased |
2011-09-14 | Well Log Performed |
2011-11-13 | Perforation Treatment Performed - Jet Perforation |
2011-11-23 | Perforation Treatment Performed - Fractured |
2011-12-04 | Perforation Treatment Performed - Jet Perforation |
2011-12-11 | Perforation Treatment Performed - Fractured |
2011-12-20 | Well Began Production |
2011-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-20 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-05 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-13 | Perforation | 760.00 | 763.00 | 13 |
2011-12-04 | Perforation | 233.20 | 233.70 | 13 |
2011-12-04 | Perforation | 240.00 | 242.00 | 13 |
2011-12-04 | Perforation | 285.00 | 287.00 | 13 |
2011-12-04 | Perforation | 290.00 | 292.00 | 13 |
2011-12-04 | Perforation | 310.40 | 310.90 | 13 |
2011-12-04 | Perforation | 345.20 | 345.70 | 13 |
2011-12-04 | Perforation | 352.60 | 353.10 | 13 |
2011-12-04 | Perforation | 355.50 | 357.50 | 13 |
2011-12-04 | Perforation | 364.00 | 367.00 | 13 |
2011-12-04 | Perforation | 377.00 | 380.00 | 13 |
2011-11-13 | Perforation | 816.00 | 818.00 | 13 |
2011-12-04 | Perforation | 398.00 | 401.00 | 13 |
2011-12-04 | Perforation | 437.00 | 440.00 | 13 |
2011-12-04 | Perforation | 448.00 | 450.00 | 13 |
2011-12-04 | Perforation | 458.00 | 461.00 | 13 |
2011-12-04 | Perforation | 489.30 | 489.80 | 13 |
2011-12-04 | Perforation | 490.40 | 492.40 | 13 |
2011-12-04 | Perforation | 503.40 | 504.90 | 13 |
2011-12-04 | Perforation | 508.00 | 509.00 | 13 |
2011-12-04 | Perforation | 510.30 | 510.80 | 13 |
2011-12-04 | Perforation | 517.20 | 517.70 | 13 |
2011-11-13 | Perforation | 939.50 | 942.50 | 13 |
2011-12-04 | Perforation | 542.70 | 544.70 | 13 |
2011-12-04 | Perforation | 557.60 | 559.10 | 13 |
2011-12-04 | Perforation | 560.00 | 562.00 | 13 |
2011-12-04 | Perforation | 609.10 | 611.10 | 13 |
2011-12-04 | Perforation | 612.10 | 612.60 | 13 |
2011-12-04 | Perforation | 627.10 | 628.10 | 13 |
2011-12-04 | Perforation | 633.20 | 634.70 | 13 |
2011-12-04 | Perforation | 637.50 | 638.50 | 13 |
2011-12-04 | Perforation | 642.90 | 643.40 | 13 |
2011-12-04 | Perforation | 689.30 | 690.70 | 13 |
2011-11-13 | Perforation | 1003.00 | 1005.00 | 13 |
2011-12-04 | Perforation | 1000.70 | 1001.20 | 13 |
2011-12-04 | Perforation | 1013.10 | 1014.10 | 13 |
2011-12-04 | Perforation | 1017.70 | 1018.20 | 13 |
2011-12-04 | Perforation | 1024.50 | 1025.00 | 13 |
2011-12-11 | Fracture | 230.00 | 1025.00 | 0 |
2011-11-23 | Fracture | 760.00 | 763.00 | 0 |
2011-11-23 | Fracture | 816.00 | 818.00 | 0 |
2011-11-23 | Fracture | 939.50 | 942.50 | 0 |
2011-11-23 | Fracture | 1003.00 | 1005.00 | 0 |
2011-12-04 | Perforation | 230.00 | 230.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 288 | 0.0 | 0.0 | 0.0 |
2012 | 8531 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8778 | 0.0 | 0.0 | 0.0 |
2017 | 8751 | 0.0 | 0.0 | 0.0 |
2018 | 8094 | 0.0 | 0.0 | 0.0 |
2019 | 8680 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]