If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244263414000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.09234,"lon":-113.555737,"icon":""}]} |
Location: 00/14-34-024-26W4/0 | |
Location Alias: 00/14-34-24-26 W4M | |
Location Alias 2: 00/14-34-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 14-34-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0430265 | |
License Date: 2011-01-18 | |
License Status: Issued | |
Spud Date: 2011-09-08 | |
Final Drill Date: 2011-09-08 | |
Well Total Depth: 1034.00 m | |
Surface Hole Latitude: 51.092340 | |
Surface Hole Longitude: -113.555737 |
Date | Event |
---|---|
2011-01-18 | Obtained License |
2011-09-08 | Direction Drilling Operation Performed - Deviate |
2011-09-08 | Finished Drilling |
2011-09-08 | Production Casing Operation Performed |
2011-09-08 | Surface Casing Operation Performed |
2011-09-08 | Well Mode changed to Drilled and Cased |
2011-09-09 | Rig Released |
2011-09-14 | Well Log Performed |
2011-11-14 | Perforation Treatment Performed - Jet Perforation |
2011-11-27 | Perforation Treatment Performed - Fractured |
2011-12-05 | Perforation Treatment Performed - Jet Perforation |
2011-12-09 | Perforation Treatment Performed - Fractured |
2011-12-20 | Well Began Production |
2011-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-20 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-08 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-14 | Perforation | 357.00 | 358.00 | 13 |
2011-11-27 | Fracture | 803.00 | 805.00 | 0 |
2011-11-27 | Fracture | 823.00 | 826.00 | 0 |
2011-11-27 | Fracture | 1002.00 | 1005.00 | 0 |
2011-12-05 | Perforation | 220.20 | 220.70 | 13 |
2011-12-05 | Perforation | 235.00 | 237.00 | 13 |
2011-12-05 | Perforation | 243.00 | 245.00 | 13 |
2011-12-05 | Perforation | 247.00 | 250.00 | 13 |
2011-12-05 | Perforation | 257.00 | 259.00 | 13 |
2011-12-05 | Perforation | 282.20 | 282.70 | 13 |
2011-12-05 | Perforation | 308.80 | 309.30 | 13 |
2011-11-14 | Perforation | 467.00 | 470.00 | 13 |
2011-12-05 | Perforation | 319.30 | 319.80 | 13 |
2011-12-05 | Perforation | 344.50 | 345.00 | 13 |
2011-12-05 | Perforation | 350.20 | 350.70 | 13 |
2011-12-05 | Perforation | 353.80 | 354.30 | 13 |
2011-12-05 | Perforation | 367.10 | 367.60 | 13 |
2011-12-05 | Perforation | 373.90 | 374.40 | 13 |
2011-12-05 | Perforation | 375.70 | 376.70 | 13 |
2011-12-05 | Perforation | 382.70 | 383.20 | 13 |
2011-12-05 | Perforation | 394.80 | 395.30 | 13 |
2011-12-05 | Perforation | 430.00 | 432.00 | 13 |
2011-11-14 | Perforation | 750.00 | 752.00 | 13 |
2011-12-05 | Perforation | 455.00 | 458.00 | 13 |
2011-12-05 | Perforation | 486.40 | 487.90 | 13 |
2011-12-05 | Perforation | 499.70 | 500.70 | 13 |
2011-12-05 | Perforation | 504.30 | 505.30 | 13 |
2011-12-05 | Perforation | 506.90 | 507.40 | 13 |
2011-12-05 | Perforation | 508.60 | 509.10 | 13 |
2011-12-05 | Perforation | 510.80 | 511.30 | 13 |
2011-12-05 | Perforation | 512.30 | 513.30 | 13 |
2011-12-05 | Perforation | 532.40 | 533.80 | 13 |
2011-12-05 | Perforation | 540.00 | 541.50 | 13 |
2011-11-14 | Perforation | 803.00 | 805.00 | 13 |
2011-12-05 | Perforation | 553.30 | 557.30 | 13 |
2011-12-05 | Perforation | 560.00 | 561.00 | 13 |
2011-12-05 | Perforation | 575.80 | 576.30 | 13 |
2011-12-05 | Perforation | 581.00 | 584.00 | 13 |
2011-12-05 | Perforation | 603.40 | 605.40 | 13 |
2011-12-05 | Perforation | 606.30 | 606.80 | 13 |
2011-12-05 | Perforation | 614.00 | 617.00 | 13 |
2011-12-05 | Perforation | 621.50 | 623.00 | 13 |
2011-12-05 | Perforation | 628.50 | 629.50 | 13 |
2011-12-05 | Perforation | 632.10 | 633.10 | 13 |
2011-11-14 | Perforation | 823.00 | 826.00 | 13 |
2011-12-05 | Perforation | 637.40 | 637.90 | 13 |
2011-12-05 | Perforation | 679.30 | 679.80 | 13 |
2011-12-05 | Perforation | 681.70 | 682.20 | 13 |
2011-12-05 | Perforation | 982.70 | 983.20 | 13 |
2011-12-05 | Perforation | 987.10 | 987.60 | 13 |
2011-12-05 | Perforation | 995.40 | 995.90 | 13 |
2011-12-05 | Perforation | 999.80 | 1000.30 | 13 |
2011-12-09 | Fracture | 220.20 | 1000.30 | 0 |
2011-11-14 | Perforation | 1002.00 | 1005.00 | 13 |
2011-11-27 | Fracture | 357.00 | 358.00 | 0 |
2011-11-27 | Fracture | 467.00 | 470.00 | 0 |
2011-11-27 | Fracture | 750.00 | 752.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 288 | 0.0 | 0.0 | 0.0 |
2012 | 8526 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8755 | 0.0 | 0.0 | 0.0 |
2018 | 8745 | 0.0 | 0.0 | 0.0 |
2019 | 8538 | 0.0 | 0.0 | 0.0 |
2020 | 2126 | 0.0 | 0.0 | 0.0 |
For data sources see[6]