If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244263405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.09234,"lon":-113.556022,"icon":""}]} |
Location: 00/05-34-024-26W4/0 | |
Location Alias: 00/05-34-24-26 W4M | |
Location Alias 2: 00/05-34-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-34-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0430227 | |
License Date: 2011-01-18 | |
License Status: Issued | |
Spud Date: 2011-09-10 | |
Final Drill Date: 2011-09-11 | |
Well Total Depth: 1136.00 m | |
Surface Hole Latitude: 51.092340 | |
Surface Hole Longitude: -113.556022 |
Date | Event |
---|---|
2011-01-18 | Obtained License |
2011-09-10 | Direction Drilling Operation Performed - Deviate |
2011-09-10 | Surface Casing Operation Performed |
2011-09-11 | Finished Drilling |
2011-09-11 | Production Casing Operation Performed |
2011-09-11 | Rig Released |
2011-09-11 | Well Mode changed to Drilled and Cased |
2011-09-14 | Well Log Performed |
2011-11-14 | Perforation Treatment Performed - Jet Perforation |
2011-11-22 | Perforation Treatment Performed - Fractured |
2011-12-01 | Perforation Treatment Performed - Jet Perforation |
2011-12-08 | Perforation Treatment Performed - Fractured |
2011-12-21 | Well Began Production |
2011-12-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-10 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-14 | Perforation | 862.00 | 863.00 | 13 |
2011-12-01 | Perforation | 342.80 | 343.30 | 13 |
2011-12-01 | Perforation | 368.30 | 368.80 | 13 |
2011-12-01 | Perforation | 381.90 | 382.90 | 13 |
2011-12-01 | Perforation | 386.00 | 389.00 | 13 |
2011-12-01 | Perforation | 400.30 | 400.80 | 13 |
2011-12-01 | Perforation | 403.20 | 404.20 | 13 |
2011-12-01 | Perforation | 423.00 | 424.00 | 13 |
2011-12-01 | Perforation | 426.50 | 428.50 | 13 |
2011-12-01 | Perforation | 450.60 | 451.10 | 13 |
2011-12-01 | Perforation | 458.30 | 458.80 | 13 |
2011-11-14 | Perforation | 1041.00 | 1043.00 | 13 |
2011-12-01 | Perforation | 468.40 | 468.90 | 13 |
2011-12-01 | Perforation | 475.00 | 477.00 | 13 |
2011-12-01 | Perforation | 484.00 | 485.00 | 13 |
2011-12-01 | Perforation | 487.50 | 489.50 | 13 |
2011-12-01 | Perforation | 496.00 | 497.00 | 13 |
2011-12-01 | Perforation | 503.00 | 505.00 | 13 |
2011-12-01 | Perforation | 524.50 | 525.00 | 13 |
2011-12-01 | Perforation | 529.20 | 530.70 | 13 |
2011-12-01 | Perforation | 540.90 | 542.90 | 13 |
2011-12-01 | Perforation | 546.60 | 547.60 | 13 |
2011-11-14 | Perforation | 1068.00 | 1070.00 | 13 |
2011-12-01 | Perforation | 549.30 | 549.80 | 13 |
2011-12-01 | Perforation | 551.30 | 551.80 | 13 |
2011-12-01 | Perforation | 555.00 | 556.00 | 13 |
2011-12-01 | Perforation | 576.90 | 577.90 | 13 |
2011-12-01 | Perforation | 583.10 | 585.10 | 13 |
2011-12-01 | Perforation | 599.80 | 601.80 | 13 |
2011-12-01 | Perforation | 602.60 | 605.10 | 13 |
2011-12-01 | Perforation | 626.90 | 627.40 | 13 |
2011-12-01 | Perforation | 633.00 | 636.00 | 13 |
2011-12-01 | Perforation | 659.70 | 661.70 | 13 |
2011-11-22 | Fracture | 862.00 | 863.00 | 0 |
2011-12-01 | Perforation | 662.70 | 663.70 | 13 |
2011-12-01 | Perforation | 677.90 | 678.90 | 13 |
2011-12-01 | Perforation | 685.50 | 687.00 | 13 |
2011-12-01 | Perforation | 688.40 | 689.90 | 13 |
2011-12-01 | Perforation | 693.60 | 694.10 | 13 |
2011-12-01 | Perforation | 732.50 | 733.00 | 13 |
2011-12-01 | Perforation | 744.60 | 745.10 | 13 |
2011-12-01 | Perforation | 763.50 | 764.00 | 13 |
2011-12-01 | Perforation | 1079.90 | 1080.40 | 13 |
2011-12-01 | Perforation | 1088.60 | 1089.60 | 13 |
2011-11-22 | Fracture | 1041.00 | 1043.00 | 0 |
2011-12-01 | Perforation | 1093.40 | 1093.90 | 13 |
2011-12-08 | Fracture | 245.00 | 1093.90 | 0 |
2011-11-22 | Fracture | 1068.00 | 1070.00 | 0 |
2011-12-01 | Perforation | 245.00 | 248.00 | 13 |
2011-12-01 | Perforation | 250.30 | 250.80 | 13 |
2011-12-01 | Perforation | 258.70 | 259.20 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 264 | 0.0 | 0.0 | 0.0 |
2012 | 8526 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8694 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8755 | 0.0 | 0.0 | 0.0 |
2018 | 8745 | 0.0 | 0.0 | 0.0 |
2019 | 8538 | 0.0 | 0.0 | 0.0 |
2020 | 2126 | 0.0 | 0.0 | 0.0 |
For data sources see[6]