If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244262706003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.072246,"lon":-113.551995,"icon":""}]} |
Location: 00/06-27-024-26W4/3 | |
Location Alias: 00/06-27-24-26 W4M | |
Location Alias 2: 00/06-27-024-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 27 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 6-27-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0291677 | |
License Date: 2003-08-21 | |
License Status: Amended | |
Spud Date: 2004-07-22 | |
Final Drill Date: 2004-07-24 | |
Well Total Depth: 1033.00 m | |
Surface Hole Latitude: 51.072246 | |
Surface Hole Longitude: -113.551995 |
Date | Event |
---|---|
2003-08-21 | Obtained License |
2004-07-22 | Surface Casing Operation Performed |
2004-07-24 | Finished Drilling |
2004-07-24 | Production Casing Operation Performed |
2004-07-24 | Rig Released |
2004-07-24 | Well Mode changed to Drilled and Cased |
2004-07-31 | Well Log Performed |
2004-11-20 | Perforation Treatment Performed - Jet Perforation |
2006-03-11 | Perforation Treatment Performed - Fractured |
2006-10-05 | Perforation Treatment Performed - Jet Perforation |
2006-10-13 | Perforation Treatment Performed - Fractured |
2006-10-27 | Well Structure changed to Commingled |
2008-11-11 | Well Log Performed |
2009-05-11 | Well Log Performed |
2009-07-01 | Well Began Production |
2009-07-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-07-01 | Well Mode changed to Flowing |
2009-09-23 | Well Log Performed |
2009-09-26 | Perforation Treatment Performed - Fractured |
2009-11-11 | Well Log Performed |
2010-04-26 | Well Log Performed |
2017-03-10 | Well Fluid changed to Coalbed Methane-Coals Only |
2017-03-10 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-11-20 | Perforation | 698.00 | 700.00 | 14 |
2006-10-05 | Perforation | 614.40 | 614.90 | 13 |
2006-10-05 | Perforation | 613.00 | 613.50 | 13 |
2006-10-05 | Perforation | 611.30 | 611.80 | 13 |
2006-10-05 | Perforation | 607.90 | 608.40 | 13 |
2006-10-05 | Perforation | 590.80 | 591.30 | 13 |
2006-10-05 | Perforation | 589.00 | 589.50 | 13 |
2006-10-05 | Perforation | 535.30 | 535.80 | 13 |
2006-10-05 | Perforation | 531.70 | 532.20 | 13 |
2006-10-05 | Perforation | 529.30 | 529.80 | 13 |
2006-10-05 | Perforation | 527.70 | 528.20 | 13 |
2004-11-20 | Perforation | 718.00 | 720.00 | 14 |
2006-10-05 | Perforation | 517.60 | 518.60 | 13 |
2006-10-05 | Perforation | 512.90 | 513.40 | 13 |
2006-10-05 | Perforation | 486.80 | 487.30 | 13 |
2006-10-05 | Perforation | 482.80 | 483.30 | 13 |
2006-10-05 | Perforation | 480.80 | 481.30 | 13 |
2006-10-05 | Perforation | 479.50 | 480.00 | 13 |
2006-10-05 | Perforation | 474.90 | 475.40 | 13 |
2006-10-05 | Perforation | 465.10 | 466.10 | 13 |
2006-10-05 | Perforation | 444.70 | 445.20 | 13 |
2006-10-05 | Perforation | 420.10 | 420.60 | 13 |
2004-11-20 | Perforation | 913.00 | 915.00 | 14 |
2006-10-05 | Perforation | 401.80 | 402.30 | 13 |
2006-10-05 | Perforation | 363.00 | 363.50 | 13 |
2006-10-05 | Perforation | 351.70 | 352.20 | 13 |
2006-10-05 | Perforation | 343.40 | 343.90 | 13 |
2006-10-05 | Perforation | 341.20 | 341.70 | 13 |
2006-10-05 | Perforation | 336.00 | 336.50 | 13 |
2006-10-05 | Perforation | 332.40 | 332.90 | 13 |
2006-10-05 | Perforation | 276.70 | 277.20 | 13 |
2006-10-05 | Perforation | 219.90 | 220.40 | 13 |
2006-10-05 | Perforation | 207.50 | 208.00 | 13 |
2006-03-11 | Fracture | 718.00 | 720.00 | 0 |
2006-10-13 | Fracture | 207.50 | 656.00 | 0 |
2009-09-26 | Fracture | 207.50 | 656.00 | 0 |
2006-03-11 | Fracture | 698.00 | 700.00 | 0 |
2006-10-05 | Perforation | 655.50 | 656.00 | 13 |
2006-10-05 | Perforation | 651.30 | 651.80 | 13 |
2006-10-05 | Perforation | 650.00 | 650.50 | 13 |
2006-10-05 | Perforation | 619.30 | 619.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 4416 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8707 | 0.0 | 0.0 | 0.0 |
2012 | 8521 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8420 | 0.0 | 0.0 | 0.0 |
2015 | 8611 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8588 | 0.0 | 0.0 | 0.0 |
2019 | 8392 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[5]