X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244262513000

Well Details

Well ID: 0244262513000
Loading map...
Location: 00/13-25-024-26W4/0
Location Alias: 00/13-25-24-26 W4M
Location Alias 2: 00/13-25-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 25
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 13-25-24-26
Operator Name: Ember Resources Inc.
License Number: 0429797
License Date: 2011-01-12
License Status: Issued
Spud Date: 2011-02-09
Final Drill Date: 2011-02-10
Well Total Depth: 1045.00 m
Surface Hole Latitude: 51.079260
Surface Hole Longitude: -113.509756

For data sources see[1][2]

Well History

Date Event
2011-01-12 Obtained License
2011-02-09 Direction Drilling Operation Performed - Deviate
2011-02-09 Surface Casing Operation Performed
2011-02-10 Finished Drilling
2011-02-10 Production Casing Operation Performed
2011-02-10 Rig Released
2011-02-10 Well Mode changed to Drilled and Cased
2011-02-14 Well Log Performed
2011-11-02 Perforation Treatment Performed - Jet Perforation
2011-11-11 Perforation Treatment Performed - Fractured
2011-12-02 Well Began Production
2011-12-02 Well Fluid changed to Coalbed Methane-Coals and Other
2011-12-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-09 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-02 Perforation 261.00 264.00 13
2011-11-02 Perforation 451.30 451.80 13
2011-11-02 Perforation 456.10 457.60 13
2011-11-02 Perforation 458.70 459.20 13
2011-11-02 Perforation 468.40 468.90 13
2011-11-02 Perforation 475.80 476.30 13
2011-11-02 Perforation 481.40 481.90 13
2011-11-02 Perforation 504.90 505.40 13
2011-11-02 Perforation 508.40 509.90 13
2011-11-02 Perforation 521.90 522.40 13
2011-11-02 Perforation 522.40 523.90 13
2011-11-02 Perforation 304.00 306.00 13
2011-11-02 Perforation 525.50 527.00 13
2011-11-02 Perforation 531.00 534.00 13
2011-11-02 Perforation 536.00 539.00 13
2011-11-02 Perforation 589.40 590.90 13
2011-11-02 Perforation 592.00 592.50 13
2011-11-02 Perforation 594.10 594.60 13
2011-11-02 Perforation 608.50 609.50 13
2011-11-02 Perforation 613.40 613.90 13
2011-11-02 Perforation 614.80 616.30 13
2011-11-02 Perforation 617.60 619.60 13
2011-11-02 Perforation 318.00 319.00 13
2011-11-02 Perforation 622.60 623.10 13
2011-11-02 Perforation 659.30 659.80 13
2011-11-02 Perforation 667.80 668.30 13
2011-11-02 Perforation 668.60 669.10 13
2011-11-02 Perforation 976.30 976.80 13
2011-11-02 Perforation 985.40 985.90 13
2011-11-11 Fracture 261.00 985.90 0
2011-11-02 Perforation 334.40 334.90 13
2011-11-02 Perforation 335.00 335.50 13
2011-11-02 Perforation 342.10 343.10 13
2011-11-02 Perforation 348.00 349.00 13
2011-11-02 Perforation 370.00 373.00 13
2011-11-02 Perforation 399.00 402.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 720 0.0 0.0 0.0
2012 8531 0.0 0.0 0.0
2013 8602 0.0 0.0 0.0
2014 8540 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8156 0.0 0.0 0.0
2017 8447 0.0 0.0 0.0
2018 6460 0.0 0.0 0.0
2019 8217 0.0 0.0 0.0
2020 1895 0.0 0.0 0.0

For data sources see[6]

References