X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244262508000

Well Details

Well ID: 0244262508000
Loading map...
Location: 00/08-25-024-26W4/0
Location Alias: 00/08-25-24-26 W4M
Location Alias 2: 00/08-25-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 25
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 8-25-24-26
Operator Name: Ember Resources Inc.
License Number: 0429783
License Date: 2011-01-11
License Status: Amended
Spud Date: 2011-08-25
Final Drill Date: 2011-08-26
Well Total Depth: 1044.00 m
Surface Hole Latitude: 51.070645
Surface Hole Longitude: -113.499236

For data sources see[1][2]

Well History

Date Event
2011-01-11 Obtained License
2011-08-25 Direction Drilling Operation Performed - Deviate
2011-08-25 Surface Casing Operation Performed
2011-08-26 Finished Drilling
2011-08-26 Production Casing Operation Performed
2011-08-26 Rig Released
2011-08-26 Well Mode changed to Drilled and Cased
2011-09-05 Well Log Performed
2011-10-15 Perforation Treatment Performed - Jet Perforation
2011-10-21 Perforation Treatment Performed - Fractured
2011-11-29 Well Began Production
2011-11-29 Well Fluid changed to Coalbed Methane-Coals Only
2011-11-29 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-25 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-15 Perforation 311.30 312.30 13
2011-10-15 Perforation 475.90 476.90 13
2011-10-15 Perforation 497.90 498.40 13
2011-10-15 Perforation 502.50 504.00 13
2011-10-15 Perforation 516.70 518.20 13
2011-10-15 Perforation 520.50 522.00 13
2011-10-15 Perforation 581.40 582.40 13
2011-10-15 Perforation 584.60 585.10 13
2011-10-15 Perforation 587.00 587.50 13
2011-10-15 Perforation 603.90 604.90 13
2011-10-15 Perforation 607.80 608.30 13
2011-10-15 Perforation 313.20 313.70 13
2011-10-15 Perforation 609.50 611.00 13
2011-10-15 Perforation 613.20 614.70 13
2011-10-15 Perforation 618.50 619.00 13
2011-10-15 Perforation 655.10 655.60 13
2011-10-15 Perforation 662.40 662.90 13
2011-10-15 Perforation 664.10 664.60 13
2011-10-15 Perforation 665.50 666.00 13
2011-10-15 Perforation 669.20 669.70 13
2011-10-15 Perforation 972.90 973.40 13
2011-10-15 Perforation 976.90 977.40 13
2011-10-15 Perforation 336.60 337.60 13
2011-10-15 Perforation 981.90 982.40 13
2011-10-21 Fracture 311.30 982.40 0
2011-10-15 Perforation 428.20 428.70 13
2011-10-15 Perforation 444.30 444.80 13
2011-10-15 Perforation 451.70 453.70 13
2011-10-15 Perforation 464.00 465.00 13
2011-10-15 Perforation 469.70 470.20 13
2011-10-15 Perforation 471.50 472.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 778 0.0 0.0 0.0
2012 8318 0.0 0.0 0.0
2013 8602 0.0 0.0 0.0
2014 8540 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8611 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 8315 0.0 0.0 0.0
2019 8392 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[6]

References