X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244262503000

Well Details

Well ID: 0244262503000
Loading map...
Location: 00/03-25-024-26W4/0
Location Alias: 00/03-25-24-26 W4M
Location Alias 2: 00/03-25-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 25
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-25-24-26
Operator Name: Ember Resources Inc.
License Number: 0427636
License Date: 2010-12-13
License Status: Issued
Spud Date: 2011-02-11
Final Drill Date: 2011-02-12
Well Total Depth: 1123.00 m
Surface Hole Latitude: 51.073748
Surface Hole Longitude: -113.509938

For data sources see[1][2]

Well History

Date Event
2010-12-13 Obtained License
2011-02-11 Direction Drilling Operation Performed - Deviate
2011-02-11 Surface Casing Operation Performed
2011-02-12 Finished Drilling
2011-02-12 Production Casing Operation Performed
2011-02-12 Rig Released
2011-02-12 Well Mode changed to Drilled and Cased
2011-02-18 Well Log Performed
2011-11-07 Perforation Treatment Performed - Jet Perforation
2011-11-15 Perforation Treatment Performed - Fractured
2011-11-26 Perforation Treatment Performed - Jet Perforation
2011-11-29 Perforation Treatment Performed - Fractured
2011-12-14 Well Began Production
2011-12-14 Well Fluid changed to Coalbed Methane-Coals and Other
2011-12-14 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-11 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-07 Perforation 608.50 611.50 13
2011-11-26 Perforation 515.30 515.80 13
2011-11-26 Perforation 520.90 521.40 13
2011-11-26 Perforation 541.70 542.20 13
2011-11-26 Perforation 547.70 549.20 13
2011-11-26 Perforation 565.40 565.90 13
2011-11-26 Perforation 566.50 567.00 13
2011-11-26 Perforation 569.80 570.80 13
2011-11-26 Perforation 578.00 580.00 13
2011-11-26 Perforation 632.90 634.40 13
2011-11-26 Perforation 639.10 639.60 13
2011-11-07 Perforation 931.00 933.00 13
2011-11-26 Perforation 650.50 652.50 13
2011-11-26 Perforation 654.50 657.50 13
2011-11-26 Perforation 661.60 663.10 13
2011-11-26 Perforation 667.40 667.90 13
2011-11-26 Perforation 669.00 672.50 13
2011-11-26 Perforation 673.50 674.50 13
2011-11-26 Perforation 711.50 712.00 13
2011-11-26 Perforation 718.80 719.30 13
2011-11-26 Perforation 721.10 721.60 13
2011-11-26 Perforation 1050.00 1050.50 13
2011-11-15 Fracture 608.50 611.50 0
2011-11-26 Perforation 1053.40 1054.40 13
2011-11-26 Perforation 1058.80 1059.30 13
2011-11-29 Fracture 333.80 1059.30 0
2011-11-15 Fracture 931.00 933.00 0
2011-11-26 Perforation 333.80 334.30 13
2011-11-26 Perforation 360.50 361.00 13
2011-11-26 Perforation 371.90 372.90 13
2011-11-26 Perforation 494.20 495.70 13
2011-11-26 Perforation 507.30 508.30 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 432 0.0 0.0 0.0
2012 8530 0.0 0.0 0.0
2013 8602 0.0 0.0 0.0
2014 8540 0.0 0.0 0.0
2015 8612 0.0 0.0 0.0
2016 8650 0.0 0.0 0.0
2017 8578 0.0 0.0 0.0
2018 8574 0.0 0.0 0.0
2019 8392 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[6]

References