If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244262401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.053583,"lon":-113.506373,"icon":""}]} |
Location: 00/01-24-024-26W4/0 | |
Location Alias: 00/01-24-24-26 W4M | |
Location Alias 2: 00/01-24-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 24 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 1-24-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0433501 | |
License Date: 2011-05-12 | |
License Status: Issued | |
Spud Date: 2011-10-03 | |
Final Drill Date: 2011-10-04 | |
Well Total Depth: 1185.00 m | |
Surface Hole Latitude: 51.053583 | |
Surface Hole Longitude: -113.506373 |
Date | Event |
---|---|
2011-05-12 | Obtained License |
2011-10-03 | Direction Drilling Operation Performed - Deviate |
2011-10-03 | Surface Casing Operation Performed |
2011-10-04 | Finished Drilling |
2011-10-04 | Production Casing Operation Performed |
2011-10-04 | Well Mode changed to Drilled and Cased |
2011-10-05 | Rig Released |
2011-10-15 | Well Log Performed |
2011-11-20 | Perforation Treatment Performed - Jet Perforation |
2011-11-27 | Perforation Treatment Performed - Fractured |
2011-12-11 | Well Began Production |
2011-12-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-11 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-03 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-20 | Perforation | 350.00 | 351.00 | 13 |
2011-11-20 | Perforation | 553.20 | 554.20 | 13 |
2011-11-20 | Perforation | 555.80 | 556.30 | 13 |
2011-11-20 | Perforation | 598.50 | 601.50 | 13 |
2011-11-20 | Perforation | 625.80 | 626.30 | 13 |
2011-11-20 | Perforation | 637.60 | 639.60 | 13 |
2011-11-20 | Perforation | 651.30 | 652.80 | 13 |
2011-11-20 | Perforation | 659.50 | 661.20 | 13 |
2011-11-20 | Perforation | 663.70 | 664.20 | 13 |
2011-11-20 | Perforation | 666.50 | 667.50 | 13 |
2011-11-20 | Perforation | 685.30 | 686.30 | 13 |
2011-11-20 | Perforation | 353.00 | 355.00 | 13 |
2011-11-20 | Perforation | 694.60 | 695.60 | 13 |
2011-11-20 | Perforation | 697.20 | 697.70 | 13 |
2011-11-20 | Perforation | 705.60 | 706.10 | 13 |
2011-11-20 | Perforation | 714.00 | 717.00 | 13 |
2011-11-20 | Perforation | 721.10 | 723.10 | 13 |
2011-11-20 | Perforation | 723.90 | 724.40 | 13 |
2011-11-20 | Perforation | 757.00 | 759.00 | 13 |
2011-11-20 | Perforation | 781.40 | 782.90 | 13 |
2011-11-20 | Perforation | 787.60 | 788.60 | 13 |
2011-11-20 | Perforation | 800.30 | 801.80 | 13 |
2011-11-20 | Perforation | 361.00 | 364.00 | 13 |
2011-11-20 | Perforation | 813.00 | 816.50 | 13 |
2011-11-20 | Perforation | 852.20 | 852.70 | 13 |
2011-11-20 | Perforation | 855.10 | 856.10 | 13 |
2011-11-20 | Perforation | 856.90 | 857.40 | 13 |
2011-11-20 | Perforation | 862.40 | 862.90 | 13 |
2011-11-20 | Perforation | 878.20 | 878.70 | 13 |
2011-11-27 | Fracture | 350.00 | 878.70 | 0 |
2011-11-20 | Perforation | 458.50 | 461.50 | 13 |
2011-11-20 | Perforation | 464.00 | 467.00 | 13 |
2011-11-20 | Perforation | 485.00 | 487.00 | 13 |
2011-11-20 | Perforation | 489.70 | 490.70 | 13 |
2011-11-20 | Perforation | 516.60 | 517.10 | 13 |
2011-11-20 | Perforation | 543.00 | 546.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 504 | 0.0 | 0.0 | 0.0 |
2012 | 8526 | 0.0 | 0.0 | 0.0 |
2013 | 8601 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8611 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8588 | 0.0 | 0.0 | 0.0 |
2019 | 8392 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[6]