If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244262203020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.05624,"lon":-113.559003,"icon":""}]} |
Location: 02/03-22-024-26W4/0 | |
Location Alias: 02/03-22-24-26 W4M | |
Location Alias 2: 02/03-22-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 3-22-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0441189 | |
License Date: 2011-12-14 | |
License Status: Issued | |
Spud Date: 2011-12-29 | |
Final Drill Date: 2011-12-30 | |
Well Total Depth: 1180.00 m | |
Surface Hole Latitude: 51.056240 | |
Surface Hole Longitude: -113.559003 |
Date | Event |
---|---|
2011-12-14 | Obtained License |
2011-12-29 | Direction Drilling Operation Performed - Deviate |
2011-12-29 | Surface Casing Operation Performed |
2011-12-30 | Finished Drilling |
2011-12-30 | Well Mode changed to Drilled and Cased |
2011-12-31 | Production Casing Operation Performed |
2011-12-31 | Rig Released |
2012-01-06 | Well Log Performed |
2012-01-27 | Perforation Treatment Performed - Jet Perforation |
2012-02-01 | Perforation Treatment Performed - Fractured |
2012-02-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-04 | Well Mode changed to Testing |
2012-02-08 | Perforation Treatment Performed - Jet Perforation |
2012-03-06 | Well Began Production |
2012-03-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-06 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-29 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-27 | Perforation | 738.00 | 741.00 | 13 |
2012-02-08 | Perforation | 477.60 | 478.10 | 13 |
2012-02-08 | Perforation | 479.50 | 480.50 | 13 |
2012-02-08 | Perforation | 485.30 | 486.30 | 13 |
2012-02-08 | Perforation | 488.40 | 489.90 | 13 |
2012-02-08 | Perforation | 492.60 | 493.10 | 13 |
2012-02-08 | Perforation | 495.20 | 495.70 | 13 |
2012-02-08 | Perforation | 498.00 | 500.00 | 13 |
2012-02-08 | Perforation | 511.00 | 512.00 | 13 |
2012-02-08 | Perforation | 554.90 | 555.40 | 13 |
2012-02-08 | Perforation | 564.10 | 565.60 | 13 |
2012-01-27 | Perforation | 969.00 | 971.00 | 13 |
2012-02-08 | Perforation | 566.60 | 567.10 | 13 |
2012-02-08 | Perforation | 592.00 | 594.00 | 13 |
2012-02-08 | Perforation | 596.50 | 598.50 | 13 |
2012-02-08 | Perforation | 602.80 | 603.30 | 13 |
2012-02-08 | Perforation | 616.10 | 616.60 | 13 |
2012-02-08 | Perforation | 625.20 | 627.20 | 13 |
2012-02-08 | Perforation | 632.80 | 633.30 | 13 |
2012-02-08 | Perforation | 636.50 | 637.50 | 13 |
2012-02-08 | Perforation | 641.20 | 641.70 | 13 |
2012-02-08 | Perforation | 651.40 | 651.90 | 13 |
2012-01-27 | Perforation | 1042.00 | 1044.00 | 13 |
2012-02-08 | Perforation | 664.50 | 665.00 | 13 |
2012-02-08 | Perforation | 670.40 | 670.90 | 13 |
2012-02-08 | Perforation | 675.70 | 676.70 | 13 |
2012-02-08 | Perforation | 678.40 | 678.90 | 13 |
2012-02-08 | Perforation | 686.10 | 686.60 | 13 |
2012-02-08 | Perforation | 689.80 | 690.80 | 13 |
2012-02-08 | Perforation | 692.00 | 693.50 | 13 |
2012-02-08 | Perforation | 702.00 | 705.00 | 13 |
2012-02-08 | Perforation | 758.00 | 759.50 | 13 |
2012-02-08 | Perforation | 763.00 | 763.50 | 13 |
2012-02-01 | Fracture | 738.00 | 741.00 | 0 |
2012-02-08 | Perforation | 777.40 | 778.40 | 13 |
2012-02-08 | Perforation | 781.00 | 784.00 | 13 |
2012-02-08 | Perforation | 790.10 | 790.60 | 13 |
2012-02-08 | Perforation | 824.00 | 824.50 | 13 |
2012-02-08 | Perforation | 830.50 | 831.00 | 13 |
2012-02-08 | Perforation | 849.50 | 850.00 | 13 |
2012-02-08 | Perforation | 1120.40 | 1120.90 | 13 |
2012-02-08 | Perforation | 1129.60 | 1130.10 | 13 |
2012-02-08 | Perforation | 1133.40 | 1133.90 | 13 |
2012-02-08 | Perforation | 1138.80 | 1139.30 | 13 |
2012-02-01 | Fracture | 969.00 | 971.00 | 0 |
2012-02-01 | Fracture | 1042.00 | 1044.00 | 0 |
2012-02-08 | Perforation | 328.00 | 330.00 | 13 |
2012-02-08 | Perforation | 332.00 | 334.00 | 13 |
2012-02-08 | Perforation | 366.00 | 369.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7023 | 0.0 | 0.0 | 0.0 |
2013 | 8601 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8611 | 0.0 | 0.0 | 0.0 |
2016 | 8649 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8588 | 0.0 | 0.0 | 0.0 |
2019 | 8392 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[6]