If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244261010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.02428,"lon":-113.545602,"icon":""}]} |
Location: 00/10-10-024-26W4/0 | |
Location Alias: 00/10-10-24-26 W4M | |
Location Alias 2: 00/10-10-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 10 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-10-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0372919 | |
License Date: 2007-01-24 | |
License Status: Issued | |
Spud Date: 2007-01-26 | |
Final Drill Date: 2007-01-27 | |
Well Total Depth: 1094.00 m | |
Surface Hole Latitude: 51.024280 | |
Surface Hole Longitude: -113.545602 |
Date | Event |
---|---|
2007-01-24 | Obtained License |
2007-01-26 | Direction Drilling Operation Performed - Deviate |
2007-01-26 | Surface Casing Operation Performed |
2007-01-27 | Finished Drilling |
2007-01-27 | Well Mode changed to Drilled and Cased |
2007-01-28 | Production Casing Operation Performed |
2007-01-28 | Rig Released |
2007-02-04 | Well Log Performed |
2007-02-11 | Perforation Treatment Performed - Jet Perforation |
2007-03-06 | Well Fluid changed to Gas |
2007-03-06 | Well Mode changed to Testing |
2007-09-16 | Perforation Treatment Performed - Fractured |
2007-10-18 | Perforation Treatment Performed - Jet Perforation |
2007-10-22 | Perforation Treatment Performed - Fractured |
2007-11-01 | Well Began Production |
2007-11-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-11-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-01-26 | 5.50 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-02-11 | Perforation | 1001.50 | 1003.50 | 13 |
2007-10-18 | Perforation | 844.90 | 845.90 | 13 |
2007-10-18 | Perforation | 826.70 | 827.20 | 13 |
2007-10-18 | Perforation | 820.20 | 822.20 | 13 |
2007-10-18 | Perforation | 771.80 | 772.30 | 13 |
2007-10-18 | Perforation | 742.90 | 744.90 | 13 |
2007-10-18 | Perforation | 738.70 | 740.70 | 13 |
2007-10-18 | Perforation | 722.90 | 724.90 | 13 |
2007-10-18 | Perforation | 713.50 | 714.00 | 13 |
2007-10-18 | Perforation | 706.70 | 707.20 | 13 |
2007-10-18 | Perforation | 688.20 | 689.20 | 13 |
2007-09-16 | Fracture | 1001.50 | 1003.50 | 0 |
2007-10-18 | Perforation | 683.20 | 683.70 | 13 |
2007-10-18 | Perforation | 679.50 | 680.00 | 13 |
2007-10-18 | Perforation | 674.10 | 675.10 | 13 |
2007-10-18 | Perforation | 657.90 | 659.90 | 13 |
2007-10-18 | Perforation | 644.60 | 645.10 | 13 |
2007-10-18 | Perforation | 597.70 | 598.20 | 13 |
2007-10-18 | Perforation | 569.90 | 570.40 | 13 |
2007-10-18 | Perforation | 512.70 | 513.20 | 13 |
2007-10-18 | Perforation | 488.40 | 488.90 | 13 |
2007-10-18 | Perforation | 320.20 | 320.70 | 13 |
2007-10-18 | Perforation | 922.40 | 922.90 | 13 |
2007-10-22 | Fracture | 320.20 | 922.90 | 0 |
2007-10-18 | Perforation | 911.40 | 911.90 | 13 |
2007-10-18 | Perforation | 909.80 | 910.30 | 13 |
2007-10-18 | Perforation | 905.20 | 905.70 | 13 |
2007-10-18 | Perforation | 856.40 | 857.40 | 13 |
2007-10-18 | Perforation | 851.30 | 853.30 | 13 |
2007-10-18 | Perforation | 849.10 | 851.10 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 1507 | 0.0 | 0.0 | 0.0 |
2008 | 8649 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 4318 | 0.0 | 0.0 | 0.0 |
2012 | 8760 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8710 | 0.0 | 0.0 | 0.0 |
2015 | 8678 | 0.0 | 0.0 | 0.0 |
2016 | 8654 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 8514 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]