If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244260609002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.016507,"lon":-113.610517,"icon":""}]} |
Location: 00/09-06-024-26W4/2 | |
Location Alias: 00/09-06-24-26 W4M | |
Location Alias 2: 00/09-06-024-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 9-6-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0350561 | |
License Date: 2006-01-30 | |
License Status: Issued | |
Spud Date: 2006-02-14 | |
Final Drill Date: 2006-02-15 | |
Well Total Depth: 810.00 m | |
Surface Hole Latitude: 51.016507 | |
Surface Hole Longitude: -113.610517 |
Date | Event |
---|---|
2006-01-30 | Obtained License |
2006-02-14 | Surface Casing Operation Performed |
2006-02-15 | Finished Drilling |
2006-02-15 | Well Mode changed to Drilled and Cased |
2006-02-16 | Production Casing Operation Performed |
2006-02-16 | Rig Released |
2006-03-10 | Well Log Performed |
2006-05-16 | Perforation Treatment Performed - Jet Perforation |
2006-10-10 | Perforation Treatment Performed - Fractured |
2010-07-21 | Well Log Performed |
2010-07-25 | Perforation Treatment Performed - Jet Perforation |
2010-08-07 | Perforation Treatment Performed - Fractured |
2010-08-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-08-10 | Well Mode changed to Testing |
2010-08-18 | Perforation Treatment Performed - Jet Perforation |
2010-08-23 | Perforation Treatment Performed - Fractured |
2010-09-01 | Well Began Production |
2010-09-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-01 | Well Mode changed to Flowing |
2010-12-08 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-05-16 | Perforation | 691.00 | 691.50 | 13 |
2006-05-16 | Perforation | 564.60 | 565.10 | 13 |
2006-05-16 | Perforation | 560.10 | 560.60 | 13 |
2006-05-16 | Perforation | 548.00 | 549.00 | 13 |
2006-05-16 | Perforation | 541.70 | 542.20 | 13 |
2006-05-16 | Perforation | 536.20 | 536.70 | 13 |
2006-05-16 | Perforation | 520.50 | 521.00 | 13 |
2006-05-16 | Perforation | 513.30 | 513.80 | 13 |
2006-05-16 | Perforation | 509.50 | 510.00 | 13 |
2006-05-16 | Perforation | 500.00 | 500.50 | 13 |
2006-05-16 | Perforation | 390.90 | 391.40 | 13 |
2006-05-16 | Perforation | 687.90 | 688.40 | 13 |
2006-05-16 | Perforation | 379.50 | 380.00 | 13 |
2006-05-16 | Perforation | 371.70 | 372.20 | 13 |
2006-05-16 | Perforation | 313.20 | 313.70 | 13 |
2006-05-16 | Perforation | 266.70 | 267.20 | 13 |
2006-10-10 | Fracture | 266.70 | 691.50 | 0 |
2010-07-25 | Perforation | 604.50 | 607.50 | 13 |
2010-07-25 | Perforation | 763.00 | 764.50 | 13 |
2010-07-25 | Perforation | 575.00 | 577.00 | 13 |
2010-08-07 | Fracture | 604.50 | 607.50 | 0 |
2010-08-07 | Fracture | 575.00 | 577.00 | 0 |
2006-05-16 | Perforation | 653.70 | 654.20 | 13 |
2010-08-07 | Fracture | 763.00 | 764.50 | 0 |
2010-08-18 | Perforation | 478.00 | 482.00 | 13 |
2010-08-18 | Perforation | 460.50 | 462.00 | 13 |
2010-08-23 | Fracture | 460.50 | 482.00 | 0 |
2010-08-23 | Fracture | 266.70 | 691.50 | 0 |
2006-05-16 | Perforation | 649.10 | 649.60 | 13 |
2006-05-16 | Perforation | 644.00 | 646.00 | 13 |
2006-05-16 | Perforation | 641.40 | 641.90 | 13 |
2006-05-16 | Perforation | 631.00 | 631.50 | 13 |
2006-05-16 | Perforation | 627.30 | 627.80 | 13 |
2006-05-16 | Perforation | 589.10 | 589.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2932 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 8760 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8710 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8654 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 8514 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[5]