If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244260511002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.018938,"lon":-113.603471,"icon":""}]} |
Location: 00/11-05-024-26W4/2 | |
Location Alias: 00/11-05-24-26 W4M | |
Location Alias 2: 00/11-05-024-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 05 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 11-5-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0413618 | |
License Date: 2009-11-02 | |
License Status: Issued | |
Spud Date: 2010-01-31 | |
Final Drill Date: 2010-02-19 | |
Well Total Depth: 1061.00 m | |
Surface Hole Latitude: 51.018938 | |
Surface Hole Longitude: -113.603471 |
Date | Event |
---|---|
2009-11-02 | Obtained License |
2010-01-31 | Surface Casing Operation Performed |
2010-02-19 | Finished Drilling |
2010-02-19 | Well Mode changed to Drilled and Cased |
2010-02-20 | Production Casing Operation Performed |
2010-02-20 | Rig Released |
2010-02-20 | Well Log Performed |
2010-02-25 | Well Log Performed |
2010-08-04 | Perforation Treatment Performed - Jet Perforation |
2010-08-26 | Perforation Treatment Performed - Jet Perforation |
2010-09-30 | Well Began Production |
2010-09-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-30 | Well Mode changed to Flowing |
2010-10-09 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-04 | Perforation | 680.20 | 680.70 | 13 |
2010-08-04 | Perforation | 520.80 | 521.30 | 13 |
2010-08-04 | Perforation | 507.60 | 508.10 | 13 |
2010-08-04 | Perforation | 497.60 | 498.60 | 13 |
2010-08-04 | Perforation | 389.00 | 390.00 | 13 |
2010-08-04 | Perforation | 376.40 | 376.90 | 13 |
2010-08-04 | Perforation | 367.70 | 368.20 | 13 |
2010-08-04 | Perforation | 265.20 | 265.70 | 13 |
2010-08-26 | Perforation | 1008.00 | 1010.00 | 13 |
2010-08-26 | Perforation | 991.00 | 992.50 | 13 |
2010-08-26 | Perforation | 929.00 | 932.00 | 13 |
2010-08-04 | Perforation | 641.70 | 642.70 | 13 |
2010-08-26 | Perforation | 906.00 | 909.00 | 13 |
2010-08-26 | Perforation | 834.00 | 836.00 | 13 |
2010-08-26 | Perforation | 593.00 | 596.00 | 13 |
2010-08-26 | Perforation | 568.50 | 571.50 | 13 |
2010-08-26 | Perforation | 457.50 | 460.50 | 13 |
2010-08-26 | Perforation | 406.00 | 409.00 | 13 |
2010-08-26 | Perforation | 385.00 | 388.00 | 13 |
2010-08-26 | Perforation | 379.00 | 381.50 | 13 |
2010-08-26 | Perforation | 221.00 | 223.00 | 13 |
2010-08-26 | Perforation | 204.50 | 206.50 | 13 |
2010-08-04 | Perforation | 638.40 | 640.40 | 13 |
2010-10-09 | Fracture | 1008.00 | 1010.00 | 0 |
2010-10-09 | Fracture | 991.00 | 992.50 | 0 |
2010-10-09 | Fracture | 929.00 | 932.00 | 0 |
2010-10-09 | Fracture | 906.00 | 909.00 | 0 |
2010-10-09 | Fracture | 834.00 | 836.00 | 0 |
2010-10-09 | Fracture | 593.00 | 596.00 | 0 |
2010-10-09 | Fracture | 568.50 | 571.50 | 0 |
2010-10-09 | Fracture | 457.50 | 460.50 | 0 |
2010-10-09 | Fracture | 406.00 | 409.00 | 0 |
2010-10-09 | Fracture | 385.00 | 388.00 | 0 |
2010-08-04 | Perforation | 635.10 | 635.60 | 13 |
2010-10-09 | Fracture | 379.00 | 381.50 | 0 |
2010-10-09 | Fracture | 221.00 | 223.00 | 0 |
2010-10-09 | Fracture | 204.50 | 206.50 | 0 |
2010-08-04 | Perforation | 618.70 | 619.70 | 13 |
2010-08-04 | Perforation | 557.40 | 557.90 | 13 |
2010-08-04 | Perforation | 553.40 | 554.40 | 13 |
2010-08-04 | Perforation | 542.40 | 544.40 | 13 |
2010-08-04 | Perforation | 536.00 | 536.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2225 | 0.0 | 0.0 | 0.0 |
2011 | 7665 | 0.0 | 0.0 | 0.0 |
2012 | 8491 | 0.0 | 0.0 | 0.0 |
2013 | 6781 | 0.0 | 0.0 | 0.0 |
2014 | 8515 | 0.0 | 0.0 | 0.0 |
2015 | 8568 | 0.0 | 0.0 | 0.0 |
2016 | 8755 | 0.0 | 0.0 | 0.0 |
2017 | 8496 | 0.0 | 0.0 | 0.0 |
2018 | 8125 | 0.0 | 0.0 | 0.0 |
2019 | 7923 | 0.0 | 0.0 | 0.0 |
2020 | 1793 | 0.0 | 0.0 | 0.0 |
For data sources see[5]