If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244260505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.015698,"lon":-113.604346,"icon":""}]} |
Location: 00/05-05-024-26W4/0 | |
Location Alias: 00/05-05-24-26 W4M | |
Location Alias 2: 00/05-05-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 05 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-5-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0352679 | |
License Date: 2006-02-23 | |
License Status: Issued | |
Spud Date: 2006-03-03 | |
Final Drill Date: 2006-03-04 | |
Well Total Depth: 805.00 m | |
Surface Hole Latitude: 51.015698 | |
Surface Hole Longitude: -113.604346 |
Date | Event |
---|---|
2006-02-23 | Obtained License |
2006-03-03 | Surface Casing Operation Performed |
2006-03-04 | Finished Drilling |
2006-03-04 | Well Mode changed to Drilled and Cased |
2006-03-05 | Production Casing Operation Performed |
2006-03-05 | Rig Released |
2006-03-08 | Well Log Performed |
2006-05-18 | Perforation Treatment Performed - Jet Perforation |
2006-06-13 | Well Fluid changed to Gas |
2006-06-13 | Well Mode changed to Testing |
2006-07-21 | Perforation Treatment Performed - Jet Perforation |
2006-07-28 | Perforation Treatment Performed - Jet Perforation |
2006-09-08 | Perforation Treatment Performed - Fractured |
2006-09-13 | Well Began Production |
2006-09-13 | Well Fluid changed to Gas |
2006-09-13 | Well Mode changed to Flowing |
2008-10-16 | Perforation Treatment Performed - Jet Perforation |
2008-11-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-11-13 | Well Mode changed to Flowing |
2008-11-14 | Well Log Performed |
2009-08-26 | Well Log Performed |
2009-11-09 | Well Log Performed |
2009-11-24 | Perforation Treatment Performed - Fractured |
2010-01-08 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-05-18 | Perforation | 757.00 | 760.00 | 13 |
2008-10-16 | Perforation | 638.30 | 640.30 | 13 |
2008-10-16 | Perforation | 635.10 | 636.10 | 13 |
2008-10-16 | Perforation | 619.20 | 620.20 | 13 |
2008-10-16 | Perforation | 585.40 | 585.90 | 13 |
2008-10-16 | Perforation | 563.40 | 563.90 | 13 |
2008-10-16 | Perforation | 558.30 | 559.30 | 13 |
2008-10-16 | Perforation | 545.50 | 547.50 | 13 |
2008-10-16 | Perforation | 538.80 | 539.30 | 13 |
2008-10-16 | Perforation | 533.80 | 534.80 | 13 |
2008-10-16 | Perforation | 518.60 | 519.10 | 13 |
2006-07-21 | Perforation | 598.00 | 600.00 | 13 |
2008-10-16 | Perforation | 511.20 | 511.70 | 13 |
2008-10-16 | Perforation | 507.00 | 507.50 | 13 |
2008-10-16 | Perforation | 502.50 | 503.00 | 13 |
2008-10-16 | Perforation | 496.70 | 497.70 | 13 |
2008-10-16 | Perforation | 449.10 | 449.60 | 13 |
2008-10-16 | Perforation | 394.90 | 395.40 | 13 |
2008-10-16 | Perforation | 389.40 | 390.40 | 13 |
2008-10-16 | Perforation | 377.10 | 377.60 | 13 |
2008-10-16 | Perforation | 368.60 | 369.10 | 13 |
2008-10-16 | Perforation | 311.40 | 311.90 | 13 |
2006-07-28 | Perforation | 566.00 | 568.00 | 13 |
2008-10-16 | Perforation | 264.90 | 265.40 | 13 |
2008-10-16 | Perforation | 527.00 | 530.00 | 13 |
2009-11-24 | Fracture | 264.90 | 685.60 | 0 |
2006-09-08 | Fracture | 757.00 | 760.00 | 0 |
2006-09-08 | Fracture | 566.00 | 568.00 | 0 |
2008-10-16 | Perforation | 685.10 | 685.60 | 13 |
2008-10-16 | Perforation | 681.80 | 682.30 | 13 |
2008-10-16 | Perforation | 648.90 | 649.90 | 13 |
2008-10-16 | Perforation | 642.60 | 643.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 2640 | 0.0 | 0.0 | 0.0 |
2007 | 6315 | 0.0 | 0.0 | 0.0 |
2008 | 7236 | 0.0 | 0.0 | 0.0 |
2009 | 4607 | 0.0 | 0.0 | 0.0 |
2010 | 6622 | 0.0 | 0.0 | 0.0 |
2011 | 6876 | 0.0 | 0.0 | 0.0 |
2012 | 7676 | 0.0 | 0.0 | 0.0 |
2013 | 7094 | 0.0 | 0.0 | 0.0 |
2014 | 7672 | 0.0 | 0.0 | 0.0 |
2015 | 7195 | 0.0 | 0.0 | 0.0 |
2016 | 6380 | 0.0 | 0.0 | 0.0 |
2017 | 5725 | 0.0 | 0.0 | 0.0 |
2018 | 6291 | 0.0 | 0.0 | 0.0 |
2019 | 3816 | 0.0 | 0.0 | 0.0 |
2020 | 1524 | 0.0 | 0.0 | 0.0 |
For data sources see[5]