X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244260315000

Well Details

Well ID: 0244260315000
Loading map...
Location: 00/15-03-024-26W4/0
Location Alias: 00/15-03-24-26 W4M
Location Alias 2: 00/15-03-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 03
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 15-3-24-26
Operator Name: Ember Resources Inc.
License Number: 0424472
License Date: 2010-10-12
License Status: Issued
Spud Date: 2010-11-21
Final Drill Date: 2010-11-28
Well Total Depth: 983.00 m
Surface Hole Latitude: 51.021710
Surface Hole Longitude: -113.550931

For data sources see[1][2]

Well History

Date Event
2010-10-12 Obtained License
2010-11-21 Surface Casing Operation Performed
2010-11-28 Finished Drilling
2010-11-28 Production Casing Operation Performed
2010-11-28 Rig Released
2010-11-28 Well Mode changed to Drilled and Cased
2010-12-01 Well Log Performed
2010-12-17 Perforation Treatment Performed - Jet Perforation
2011-01-14 Perforation Treatment Performed - Fractured
2011-01-17 Well Fluid changed to Gas
2011-01-17 Well Mode changed to Testing
2011-01-27 Perforation Treatment Performed - Jet Perforation
2011-01-31 Perforation Treatment Performed - Fractured
2011-02-15 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-17 Perforation 756.00 758.00 13
2011-01-27 Perforation 520.70 522.20 13
2011-01-27 Perforation 497.80 498.30 13
2011-01-27 Perforation 503.90 504.40 13
2011-01-27 Perforation 335.30 335.80 13
2011-01-27 Perforation 352.30 352.80 13
2011-01-27 Perforation 218.40 219.90 13
2011-01-27 Perforation 229.20 229.70 13
2011-01-27 Perforation 460.60 461.10 13
2011-01-27 Perforation 462.00 462.50 13
2011-01-27 Perforation 396.70 397.20 13
2010-12-17 Perforation 554.50 556.50 13
2011-01-27 Perforation 440.10 440.60 13
2011-01-27 Perforation 524.70 525.70 13
2011-01-27 Perforation 387.50 389.00 13
2011-01-27 Perforation 195.00 197.00 13
2011-01-27 Perforation 178.00 180.00 13
2011-01-27 Perforation 443.00 445.00 13
2011-01-27 Perforation 834.50 836.00 13
2011-01-27 Perforation 817.50 819.00 13
2011-01-27 Perforation 721.50 723.50 13
2011-01-27 Perforation 652.30 652.80 13
2011-01-14 Fracture 756.00 758.00 0
2011-01-27 Perforation 596.90 600.90 13
2011-01-27 Perforation 594.50 595.50 13
2011-01-27 Perforation 581.50 582.00 13
2011-01-27 Perforation 576.70 577.70 13
2011-01-27 Perforation 604.60 605.10 13
2011-01-27 Perforation 645.40 645.90 13
2011-01-27 Perforation 640.50 641.00 13
2011-01-31 Fracture 218.40 652.80 0
2011-01-31 Fracture 178.00 836.00 0
2011-01-14 Fracture 554.50 556.50 0
2011-01-27 Perforation 478.50 479.50 13
2011-01-27 Perforation 484.20 485.20 13
2011-01-27 Perforation 472.90 473.90 13
2011-01-27 Perforation 476.90 477.40 13
2011-01-27 Perforation 511.20 512.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4 0.0 0.0 0.0

For data sources see[5]

References