X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244260311000

Well Details

Well ID: 0244260311000
Loading map...
Location: 00/11-03-024-26W4/0
Location Alias: 00/11-03-24-26 W4M
Location Alias 2: 00/11-03-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 03
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 11-3-24-26
Operator Name: Ember Resources Inc.
License Number: 0426519
License Date: 2010-11-29
License Status: Issued
Spud Date: 2010-12-19
Final Drill Date: 2010-12-20
Well Total Depth: 988.00 m
Surface Hole Latitude: 51.016913
Surface Hole Longitude: -113.551988

For data sources see[1][2]

Well History

Date Event
2010-11-29 Obtained License
2010-12-19 Surface Casing Operation Performed
2010-12-20 Finished Drilling
2010-12-20 Production Casing Operation Performed
2010-12-20 Rig Released
2010-12-20 Well Mode changed to Drilled and Cased
2011-01-06 Well Log Performed
2011-01-27 Perforation Treatment Performed - Jet Perforation
2011-02-03 Perforation Treatment Performed - Fractured
2011-02-23 Well Began Production
2011-02-23 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-27 Perforation 493.30 493.80 13
2011-01-27 Perforation 330.60 331.10 13
2011-01-27 Perforation 339.10 339.60 13
2011-01-27 Perforation 221.70 222.20 13
2011-01-27 Perforation 231.20 231.70 13
2011-01-27 Perforation 448.30 448.80 13
2011-01-27 Perforation 471.50 472.50 13
2011-01-27 Perforation 339.70 340.20 13
2011-01-27 Perforation 363.30 363.80 13
2011-01-27 Perforation 659.90 660.40 13
2011-01-27 Perforation 671.40 671.90 13
2011-01-27 Perforation 505.70 506.20 13
2011-01-27 Perforation 652.90 653.40 13
2011-01-27 Perforation 655.30 655.80 13
2011-01-27 Perforation 427.00 429.00 13
2011-01-27 Perforation 919.00 921.00 13
2011-01-27 Perforation 200.00 201.50 13
2011-01-27 Perforation 242.20 243.50 13
2011-01-27 Perforation 599.70 600.70 13
2011-01-27 Perforation 581.70 582.70 13
2011-01-27 Perforation 582.70 583.20 13
2011-01-27 Perforation 586.30 587.30 13
2011-01-27 Perforation 477.70 479.20 13
2011-01-27 Perforation 647.90 648.40 13
2011-01-27 Perforation 651.20 651.70 13
2011-01-27 Perforation 602.70 605.70 13
2011-01-27 Perforation 609.10 610.10 13
2011-02-03 Fracture 221.70 671.90 0
2011-02-03 Fracture 200.00 921.00 0
2011-01-27 Perforation 480.50 481.50 13
2011-01-27 Perforation 529.10 530.60 13
2011-01-27 Perforation 533.20 534.70 13
2011-01-27 Perforation 511.00 511.50 13
2011-01-27 Perforation 518.30 519.80 13
2011-01-27 Perforation 472.90 473.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7486 0.0 0.0 0.0
2012 8760 0.0 0.0 0.0
2013 8740 0.0 0.0 0.0
2014 8710 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8654 0.0 0.0 0.0
2017 8658 0.0 0.0 0.0
2018 8514 0.0 0.0 0.0
2019 8686 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[5]

References