If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244260103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.016666,"lon":-113.503443,"icon":""}]} |
Location: 00/03-01-024-26W4/0 | |
Location Alias: 00/03-01-24-26 W4M | |
Location Alias 2: 00/03-01-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 01 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 3-1-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0435935 | |
License Date: 2011-08-11 | |
License Status: Issued | |
Spud Date: 2011-09-15 | |
Final Drill Date: 2011-09-17 | |
Well Total Depth: 1257.00 m | |
Surface Hole Latitude: 51.016666 | |
Surface Hole Longitude: -113.503443 |
Date | Event |
---|---|
2011-08-11 | Obtained License |
2011-09-15 | Direction Drilling Operation Performed - Deviate |
2011-09-16 | Surface Casing Operation Performed |
2011-09-17 | Finished Drilling |
2011-09-17 | Production Casing Operation Performed |
2011-09-17 | Rig Released |
2011-09-17 | Well Mode changed to Drilled and Cased |
2011-10-02 | Well Log Performed |
2011-10-17 | Perforation Treatment Performed - Jet Perforation |
2011-10-23 | Perforation Treatment Performed - Fractured |
2011-10-26 | Well Fluid changed to Gas |
2011-10-26 | Well Mode changed to Testing |
2011-10-31 | Perforation Treatment Performed - Jet Perforation |
2011-11-20 | Perforation Treatment Performed - Fractured |
2012-01-27 | Well Began Production |
2012-01-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-01-27 | Well Mode changed to Flowing |
2019-01-20 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-15 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-17 | Perforation | 939.00 | 941.00 | 13 |
2011-10-31 | Perforation | 455.90 | 456.40 | 13 |
2011-10-31 | Perforation | 460.20 | 461.20 | 13 |
2011-10-31 | Perforation | 473.50 | 475.50 | 13 |
2011-10-31 | Perforation | 480.40 | 481.40 | 13 |
2011-10-31 | Perforation | 533.50 | 534.50 | 13 |
2011-10-31 | Perforation | 596.40 | 596.90 | 13 |
2011-10-31 | Perforation | 620.40 | 624.40 | 13 |
2011-10-31 | Perforation | 637.70 | 638.70 | 13 |
2011-10-31 | Perforation | 648.10 | 649.10 | 13 |
2011-10-31 | Perforation | 677.70 | 678.20 | 13 |
2011-10-17 | Perforation | 1080.50 | 1082.50 | 13 |
2011-10-31 | Perforation | 679.90 | 680.90 | 13 |
2011-10-31 | Perforation | 686.90 | 688.90 | 13 |
2011-10-31 | Perforation | 701.30 | 702.80 | 13 |
2011-10-31 | Perforation | 707.60 | 708.60 | 13 |
2011-10-31 | Perforation | 747.00 | 749.00 | 13 |
2011-10-31 | Perforation | 778.40 | 779.90 | 13 |
2011-10-31 | Perforation | 786.10 | 787.10 | 13 |
2011-10-31 | Perforation | 805.00 | 806.50 | 13 |
2011-10-31 | Perforation | 810.90 | 811.40 | 13 |
2011-10-31 | Perforation | 813.00 | 814.50 | 13 |
2011-10-17 | Perforation | 1190.50 | 1192.50 | 13 |
2011-10-31 | Perforation | 815.30 | 817.30 | 13 |
2011-10-31 | Perforation | 819.90 | 820.40 | 13 |
2011-10-31 | Perforation | 863.40 | 863.90 | 13 |
2011-10-31 | Perforation | 878.30 | 878.80 | 13 |
2011-10-31 | Perforation | 891.70 | 892.20 | 13 |
2011-10-31 | Perforation | 894.40 | 894.90 | 13 |
2011-11-20 | Fracture | 334.00 | 894.90 | 0 |
2011-10-23 | Fracture | 939.00 | 941.00 | 0 |
2011-10-23 | Fracture | 1080.50 | 1082.50 | 0 |
2011-10-23 | Fracture | 1190.50 | 1192.50 | 0 |
2011-10-31 | Perforation | 334.00 | 336.00 | 13 |
2011-10-31 | Perforation | 364.20 | 364.70 | 13 |
2011-10-31 | Perforation | 440.60 | 441.10 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 4 | 0.0 | 0.0 | 0.0 |
2012 | 3819 | 0.0 | 0.0 | 0.0 |
2013 | 8647 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8649 | 0.0 | 0.0 | 0.0 |
2016 | 8624 | 0.0 | 0.0 | 0.0 |
2017 | 8688 | 0.0 | 0.0 | 0.0 |
2018 | 8530 | 0.0 | 0.0 | 0.0 |
2019 | 7980 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-01-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]