If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244253514003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.094051,"lon":-113.391277,"icon":""}]} |
Location: 00/14-35-024-25W4/3 | |
Location Alias: 00/14-35-24-25 W4M | |
Location Alias 2: 00/14-35-024-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 35 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 14-35-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0395702 | |
License Date: 2008-04-02 | |
License Status: Issued | |
Spud Date: 2008-11-01 | |
Final Drill Date: 2008-11-03 | |
Well Total Depth: 933.00 m | |
Surface Hole Latitude: 51.094051 | |
Surface Hole Longitude: -113.391277 |
Date | Event |
---|---|
2008-04-02 | Obtained License |
2008-11-01 | Surface Casing Operation Performed |
2008-11-03 | Finished Drilling |
2008-11-03 | Production Casing Operation Performed |
2008-11-03 | Rig Released |
2008-11-03 | Well Mode changed to Drilled and Cased |
2008-11-06 | Well Log Performed |
2008-11-21 | Perforation Treatment Performed - Jet Perforation |
2008-11-30 | Perforation Treatment Performed - Jet Perforation |
2009-01-13 | Perforation Treatment Performed - Fractured |
2010-01-24 | Perforation Treatment Performed - Jet Perforation |
2010-02-02 | Perforation Treatment Performed - Fractured |
2010-02-17 | Perforation Treatment Performed - Jet Perforation |
2010-02-21 | Perforation Treatment Performed - Fractured |
2010-02-23 | Perforation Treatment Performed - Fractured |
2010-03-03 | Well Began Production |
2010-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-03-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-11-21 | Perforation | 846.00 | 848.00 | 13 |
2010-02-17 | Perforation | 394.50 | 395.50 | 13 |
2010-02-17 | Perforation | 431.60 | 432.60 | 13 |
2010-02-17 | Perforation | 498.50 | 499.50 | 13 |
2010-02-17 | Perforation | 445.30 | 448.30 | 13 |
2010-02-17 | Perforation | 444.20 | 444.70 | 13 |
2010-02-17 | Perforation | 365.70 | 366.20 | 13 |
2010-02-17 | Perforation | 281.90 | 282.40 | 13 |
2010-02-17 | Perforation | 258.80 | 259.30 | 13 |
2010-02-17 | Perforation | 379.30 | 380.30 | 13 |
2010-02-17 | Perforation | 392.40 | 392.90 | 13 |
2008-11-30 | Perforation | 706.00 | 708.00 | 13 |
2010-02-17 | Perforation | 391.20 | 391.70 | 13 |
2010-02-17 | Perforation | 388.70 | 389.20 | 13 |
2010-02-17 | Perforation | 504.00 | 505.00 | 13 |
2010-02-17 | Perforation | 297.50 | 300.00 | 13 |
2010-02-17 | Perforation | 206.50 | 208.50 | 13 |
2010-02-17 | Perforation | 178.50 | 181.00 | 13 |
2010-02-17 | Perforation | 329.50 | 331.00 | 13 |
2010-02-17 | Perforation | 670.00 | 671.50 | 13 |
2010-02-17 | Perforation | 358.00 | 360.00 | 13 |
2010-02-17 | Perforation | 348.00 | 349.50 | 13 |
2009-01-13 | Fracture | 706.00 | 708.00 | 0 |
2010-02-17 | Perforation | 513.90 | 514.40 | 13 |
2010-02-17 | Perforation | 527.20 | 529.20 | 13 |
2010-02-17 | Perforation | 523.30 | 524.30 | 13 |
2010-02-17 | Perforation | 563.30 | 563.80 | 13 |
2010-02-17 | Perforation | 565.00 | 565.50 | 13 |
2010-02-21 | Fracture | 258.80 | 565.50 | 0 |
2010-02-21 | Fracture | 329.50 | 671.50 | 0 |
2010-02-23 | Fracture | 206.50 | 300.00 | 0 |
2010-01-24 | Perforation | 871.00 | 872.00 | 13 |
2010-01-24 | Perforation | 638.50 | 639.50 | 13 |
2010-02-02 | Fracture | 871.00 | 872.00 | 0 |
2010-02-02 | Fracture | 638.50 | 639.50 | 0 |
2010-02-17 | Perforation | 409.60 | 410.10 | 13 |
2010-02-17 | Perforation | 399.30 | 399.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7176 | 0.0 | 0.0 | 0.0 |
2011 | 8756 | 0.0 | 0.0 | 0.0 |
2012 | 8189 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8662 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]