If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244253508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.085623,"lon":-113.382106,"icon":""}]} |
Location: 00/08-35-024-25W4/0 | |
Location Alias: 00/08-35-24-25 W4M | |
Location Alias 2: 00/08-35-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 35 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 8-35-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0287752 | |
License Date: 2003-05-29 | |
License Status: Issued | |
Spud Date: 2003-06-26 | |
Final Drill Date: 2003-07-05 | |
Well Total Depth: 963.00 m | |
Surface Hole Latitude: 51.085623 | |
Surface Hole Longitude: -113.382106 |
Date | Event |
---|---|
2003-05-29 | Obtained License |
2003-06-26 | Surface Casing Operation Performed |
2003-07-05 | Finished Drilling |
2003-07-05 | Production Casing Operation Performed |
2003-07-05 | Rig Released |
2003-07-05 | Well Mode changed to Drilled and Cased |
2003-07-17 | Well Log Performed |
2003-09-04 | Perforation Treatment Performed - Jet Perforation |
2003-09-09 | Well Fluid changed to Gas |
2003-09-09 | Well Mode changed to Testing |
2003-09-24 | Perforation Treatment Performed - Jet Perforation |
2003-10-06 | Perforation Treatment Performed - Jet Perforation |
2003-10-19 | Perforation Treatment Performed - Fractured |
2005-12-19 | Well Began Production |
2005-12-19 | Well Fluid changed to Gas |
2005-12-19 | Well Mode changed to Flowing |
2009-02-07 | Perforation Treatment Performed - Jet Perforation |
2009-02-16 | Perforation Treatment Performed - Fractured |
2009-03-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-09 | Well Mode changed to Flowing |
2010-09-12 | Perforation Treatment Performed - Jet Perforation |
2010-10-07 | Perforation Treatment Performed - Fractured |
2010-10-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-10-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-09-04 | Perforation | 875.00 | 878.00 | 13 |
2009-02-07 | Perforation | 512.80 | 513.30 | 14 |
2009-02-07 | Perforation | 511.80 | 512.30 | 13 |
2009-02-07 | Perforation | 504.20 | 505.20 | 14 |
2009-02-07 | Perforation | 444.40 | 446.40 | 14 |
2009-02-07 | Perforation | 443.00 | 443.50 | 14 |
2009-02-07 | Perforation | 432.00 | 433.00 | 14 |
2009-02-07 | Perforation | 427.20 | 427.70 | 14 |
2009-02-07 | Perforation | 421.00 | 421.50 | 14 |
2009-02-07 | Perforation | 410.60 | 411.10 | 14 |
2009-02-07 | Perforation | 401.90 | 402.90 | 14 |
2003-09-24 | Perforation | 484.00 | 887.00 | 13 |
2009-02-07 | Perforation | 398.80 | 399.80 | 14 |
2009-02-07 | Perforation | 397.10 | 398.10 | 14 |
2009-02-07 | Perforation | 383.00 | 384.00 | 14 |
2009-02-07 | Perforation | 371.00 | 371.50 | 14 |
2009-02-07 | Perforation | 333.10 | 333.60 | 14 |
2009-02-07 | Perforation | 265.90 | 266.40 | 14 |
2009-02-16 | Fracture | 265.90 | 570.40 | 0 |
2010-09-12 | Perforation | 673.50 | 675.00 | 13 |
2010-09-12 | Perforation | 507.50 | 508.50 | 13 |
2010-09-12 | Perforation | 448.00 | 449.50 | 13 |
2003-10-06 | Perforation | 454.00 | 457.00 | 13 |
2010-09-12 | Perforation | 310.50 | 312.50 | 13 |
2010-09-12 | Perforation | 184.50 | 186.50 | 13 |
2010-10-07 | Fracture | 310.50 | 675.00 | 0 |
2003-10-19 | Fracture | 454.00 | 457.00 | 0 |
2009-02-07 | Perforation | 569.40 | 570.40 | 14 |
2009-02-07 | Perforation | 567.20 | 567.70 | 14 |
2009-02-07 | Perforation | 535.70 | 536.70 | 14 |
2009-02-07 | Perforation | 531.20 | 534.20 | 14 |
2009-02-07 | Perforation | 526.30 | 526.80 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 48 | 0.0 | 0.0 | 0.0 |
2005 | 96 | 0.0 | 0.0 | 0.0 |
2006 | 8707 | 0.0 | 0.0 | 0.0 |
2007 | 8641 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8088 | 0.0 | 0.0 | 0.0 |
2010 | 8423 | 0.0 | 0.0 | 0.0 |
2011 | 8180 | 0.0 | 0.0 | 0.0 |
2012 | 8193 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8662 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]