X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244253114020

Well Details

Well ID: 0244253114020
Loading map...
Location: 02/14-31-024-25W4/0
Location Alias: 02/14-31-24-25 W4M
Location Alias 2: 02/14-31-024-25 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 25
Section: 31
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 14-31-24-25
Operator Name: Ember Resources Inc.
License Number: 0443118
License Date: 2012-01-19
License Status: Issued
Spud Date: 2012-01-27
Final Drill Date: 2012-01-28
Well Total Depth: 937.00 m
Surface Hole Latitude: 51.094938
Surface Hole Longitude: -113.485799

For data sources see[1][2]

Well History

Date Event
2012-01-19 Obtained License
2012-01-27 Surface Casing Operation Performed
2012-01-28 Finished Drilling
2012-01-28 Production Casing Operation Performed
2012-01-28 Rig Released
2012-01-28 Well Mode changed to Drilled and Cased
2012-02-21 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-21 Well Mode changed to Testing
2012-02-27 Perforation Treatment Performed - Jet Perforation
2012-03-01 Perforation Treatment Performed - Fractured
2012-03-18 Well Began Production
2012-03-18 Well Fluid changed to Coalbed Methane-Coals and Other
2012-03-18 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-27 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-27 Perforation 277.40 278.40 13
2012-02-27 Perforation 414.90 415.40 13
2012-02-27 Perforation 417.60 418.10 13
2012-02-27 Perforation 419.90 420.90 13
2012-02-27 Perforation 428.00 430.00 13
2012-02-27 Perforation 438.60 439.60 13
2012-02-27 Perforation 441.20 442.70 13
2012-02-27 Perforation 462.90 463.90 13
2012-02-27 Perforation 520.10 521.10 13
2012-02-27 Perforation 522.00 522.50 13
2012-02-27 Perforation 538.00 539.00 13
2012-02-27 Perforation 286.30 286.80 13
2012-02-27 Perforation 544.20 545.70 13
2012-02-27 Perforation 548.50 549.50 13
2012-02-27 Perforation 553.00 553.50 13
2012-02-27 Perforation 587.40 587.90 13
2012-02-27 Perforation 590.00 591.00 13
2012-02-27 Perforation 593.80 594.30 13
2012-02-27 Perforation 613.90 614.40 13
2012-02-27 Perforation 686.00 688.00 13
2012-02-27 Perforation 875.80 876.30 13
2012-02-27 Perforation 882.60 883.10 13
2012-02-27 Perforation 290.80 291.30 13
2012-02-27 Perforation 887.00 887.50 13
2012-03-01 Fracture 277.40 887.50 0
2012-02-27 Perforation 298.30 299.30 13
2012-02-27 Perforation 340.00 340.50 13
2012-02-27 Perforation 344.60 345.10 13
2012-02-27 Perforation 377.80 378.30 13
2012-02-27 Perforation 395.50 397.50 13
2012-02-27 Perforation 409.10 409.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6364 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8655 0.0 0.0 0.0
2015 8661 0.0 0.0 0.0
2016 8699 0.0 0.0 0.0
2017 8708 0.0 0.0 0.0
2018 8750 0.0 0.0 0.0
2019 8682 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[6]

References