If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244253110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.094887,"lon":-113.485879,"icon":""}]} |
Location: 00/10-31-024-25W4/0 | |
Location Alias: 00/10-31-24-25 W4M | |
Location Alias 2: 00/10-31-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 31 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-31-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0442903 | |
License Date: 2012-01-16 | |
License Status: Issued | |
Spud Date: 2012-01-24 | |
Final Drill Date: 2012-01-26 | |
Well Total Depth: 1196.00 m | |
Surface Hole Latitude: 51.094887 | |
Surface Hole Longitude: -113.485879 |
Date | Event |
---|---|
2012-01-16 | Obtained License |
2012-01-24 | Direction Drilling Operation Performed - Deviate |
2012-01-24 | Surface Casing Operation Performed |
2012-01-26 | Finished Drilling |
2012-01-26 | Production Casing Operation Performed |
2012-01-26 | Rig Released |
2012-01-26 | Well Mode changed to Drilled and Cased |
2012-02-01 | Well Log Performed |
2012-02-17 | Perforation Treatment Performed - Jet Perforation |
2012-02-18 | Perforation Treatment Performed - Fractured |
2012-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-24 | Well Mode changed to Testing |
2012-02-28 | Perforation Treatment Performed - Jet Perforation |
2012-03-02 | Perforation Treatment Performed - Fractured |
2012-03-18 | Well Began Production |
2012-03-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-18 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-24 | Precision Drilling Corporation | 292 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-24 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-17 | Perforation | 568.00 | 570.00 | 13 |
2012-02-28 | Perforation | 385.50 | 386.00 | 13 |
2012-02-28 | Perforation | 394.40 | 395.40 | 13 |
2012-02-28 | Perforation | 401.90 | 402.40 | 13 |
2012-02-28 | Perforation | 441.50 | 442.00 | 13 |
2012-02-28 | Perforation | 452.20 | 452.70 | 13 |
2012-02-28 | Perforation | 498.20 | 498.70 | 13 |
2012-02-28 | Perforation | 522.30 | 524.30 | 13 |
2012-02-28 | Perforation | 535.40 | 536.90 | 13 |
2012-02-28 | Perforation | 543.70 | 545.20 | 13 |
2012-02-28 | Perforation | 546.30 | 546.80 | 13 |
2012-02-17 | Perforation | 615.00 | 617.00 | 13 |
2012-02-28 | Perforation | 550.70 | 551.70 | 13 |
2012-02-28 | Perforation | 582.60 | 584.10 | 13 |
2012-02-28 | Perforation | 586.20 | 588.20 | 13 |
2012-02-28 | Perforation | 597.20 | 597.70 | 13 |
2012-02-28 | Perforation | 600.80 | 602.80 | 13 |
2012-02-28 | Perforation | 604.10 | 606.10 | 13 |
2012-02-28 | Perforation | 673.70 | 675.20 | 13 |
2012-02-28 | Perforation | 677.60 | 678.10 | 13 |
2012-02-28 | Perforation | 680.20 | 680.70 | 13 |
2012-02-28 | Perforation | 697.70 | 699.20 | 13 |
2012-02-17 | Perforation | 872.00 | 874.00 | 13 |
2012-02-28 | Perforation | 705.40 | 706.90 | 13 |
2012-02-28 | Perforation | 711.60 | 712.60 | 13 |
2012-02-28 | Perforation | 717.30 | 717.80 | 13 |
2012-02-28 | Perforation | 762.30 | 763.30 | 13 |
2012-02-28 | Perforation | 766.70 | 767.20 | 13 |
2012-02-28 | Perforation | 769.70 | 770.70 | 13 |
2012-02-28 | Perforation | 771.00 | 772.50 | 13 |
2012-02-28 | Perforation | 794.50 | 795.00 | 13 |
2012-02-28 | Perforation | 853.00 | 855.00 | 13 |
2012-02-28 | Perforation | 1138.50 | 1139.00 | 13 |
2012-02-18 | Fracture | 568.00 | 570.00 | 0 |
2012-02-28 | Perforation | 1148.90 | 1149.40 | 13 |
2012-02-28 | Perforation | 1156.00 | 1158.00 | 13 |
2012-03-02 | Fracture | 367.70 | 1158.00 | 0 |
2012-02-18 | Fracture | 615.00 | 617.00 | 0 |
2012-02-18 | Fracture | 872.00 | 874.00 | 0 |
2012-02-28 | Perforation | 367.70 | 368.70 | 13 |
2012-02-28 | Perforation | 381.50 | 382.00 | 13 |
2012-02-28 | Perforation | 382.90 | 383.40 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6416 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8661 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8677 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[7]