If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244252904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.069157,"lon":-113.46697,"icon":""}]} |
Location: 00/04-29-024-25W4/0 | |
Location Alias: 00/04-29-24-25 W4M | |
Location Alias 2: 00/04-29-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 4-29-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0385122 | |
License Date: 2007-11-19 | |
License Status: Issued | |
Spud Date: 2008-01-07 | |
Final Drill Date: 2008-01-11 | |
Well Total Depth: 950.00 m | |
Surface Hole Latitude: 51.069157 | |
Surface Hole Longitude: -113.466970 |
Date | Event |
---|---|
2007-11-19 | Obtained License |
2008-01-07 | Surface Casing Operation Performed |
2008-01-11 | Finished Drilling |
2008-01-11 | Production Casing Operation Performed |
2008-01-11 | Rig Released |
2008-01-11 | Well Mode changed to Drilled and Cased |
2008-01-17 | Well Log Performed |
2008-02-01 | Perforation Treatment Performed - Jet Perforation |
2008-02-06 | Perforation Treatment Performed - Jet Perforation |
2008-02-26 | Perforation Treatment Performed - Fractured |
2008-03-20 | Well Began Production |
2008-03-20 | Well Fluid changed to Gas |
2008-03-20 | Well Mode changed to Flowing |
2010-10-08 | Perforation Treatment Performed - Jet Perforation |
2010-10-21 | Well Structure changed to Commingled |
2019-01-17 | Perforation Treatment Performed - Jet Perforation |
2019-01-17 | Well Log Performed |
2019-01-26 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-02-01 | Perforation | 893.00 | 896.00 | 13 |
2019-01-17 | Perforation | 308.10 | 309.10 | 13 |
2019-01-17 | Perforation | 312.90 | 313.90 | 13 |
2019-01-17 | Perforation | 386.80 | 389.30 | 13 |
2019-01-17 | Perforation | 392.60 | 393.60 | 13 |
2019-01-17 | Perforation | 419.00 | 420.00 | 13 |
2019-01-17 | Perforation | 429.80 | 430.80 | 13 |
2019-01-17 | Perforation | 437.40 | 438.40 | 13 |
2019-01-17 | Perforation | 442.00 | 443.00 | 13 |
2019-01-17 | Perforation | 456.60 | 457.60 | 13 |
2019-01-17 | Perforation | 461.40 | 462.90 | 13 |
2008-02-06 | Perforation | 884.50 | 886.50 | 13 |
2019-01-17 | Perforation | 472.10 | 474.10 | 13 |
2019-01-17 | Perforation | 475.80 | 476.80 | 13 |
2019-01-17 | Perforation | 484.40 | 485.40 | 13 |
2019-01-17 | Perforation | 528.30 | 529.80 | 13 |
2019-01-17 | Perforation | 533.30 | 534.30 | 13 |
2019-01-17 | Perforation | 543.70 | 544.70 | 13 |
2019-01-17 | Perforation | 547.00 | 548.00 | 13 |
2019-01-17 | Perforation | 554.40 | 555.40 | 13 |
2019-01-17 | Perforation | 557.30 | 558.30 | 13 |
2019-01-17 | Perforation | 605.10 | 606.10 | 13 |
2008-02-26 | Fracture | 884.50 | 886.50 | 0 |
2019-01-17 | Perforation | 607.70 | 608.70 | 13 |
2019-01-26 | Fracture | 284.10 | 285.10 | 0 |
2019-01-26 | Fracture | 297.00 | 298.00 | 0 |
2019-01-26 | Fracture | 308.10 | 309.10 | 0 |
2019-01-26 | Fracture | 312.90 | 313.90 | 0 |
2019-01-26 | Fracture | 386.80 | 389.30 | 0 |
2019-01-26 | Fracture | 392.60 | 393.60 | 0 |
2019-01-26 | Fracture | 419.00 | 420.00 | 0 |
2019-01-26 | Fracture | 429.80 | 430.80 | 0 |
2019-01-26 | Fracture | 437.40 | 438.40 | 0 |
2010-10-08 | Perforation | 912.50 | 915.50 | 13 |
2019-01-26 | Fracture | 442.00 | 443.00 | 0 |
2019-01-26 | Fracture | 456.60 | 457.60 | 0 |
2019-01-26 | Fracture | 461.40 | 462.90 | 0 |
2019-01-26 | Fracture | 472.10 | 474.10 | 0 |
2019-01-26 | Fracture | 475.80 | 476.80 | 0 |
2019-01-26 | Fracture | 484.40 | 485.40 | 0 |
2019-01-26 | Fracture | 528.30 | 529.80 | 0 |
2019-01-26 | Fracture | 533.30 | 534.30 | 0 |
2019-01-26 | Fracture | 543.70 | 544.70 | 0 |
2019-01-26 | Fracture | 547.00 | 548.00 | 0 |
2010-10-08 | Perforation | 860.00 | 863.00 | 13 |
2019-01-26 | Fracture | 554.40 | 555.40 | 0 |
2019-01-26 | Fracture | 557.30 | 558.30 | 0 |
2019-01-26 | Fracture | 605.10 | 606.10 | 0 |
2019-01-26 | Fracture | 607.70 | 608.70 | 0 |
2010-10-08 | Perforation | 678.50 | 681.50 | 13 |
2010-10-08 | Perforation | 507.50 | 510.50 | 13 |
2019-01-17 | Perforation | 284.10 | 285.10 | 13 |
2019-01-17 | Perforation | 297.00 | 298.00 | 13 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-01-26 | 2019-01-26 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 6888 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 6185 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]