If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244251916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.063549,"lon":-113.474389,"icon":""}]} |
Location: 00/16-19-024-25W4/0 | |
Location Alias: 00/16-19-24-25 W4M | |
Location Alias 2: 00/16-19-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 19 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 16-19-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0421062 | |
License Date: 2010-06-09 | |
License Status: Issued | |
Spud Date: 2010-11-21 | |
Final Drill Date: 2010-11-30 | |
Well Total Depth: 947.00 m | |
Surface Hole Latitude: 51.063549 | |
Surface Hole Longitude: -113.474389 |
Date | Event |
---|---|
2010-06-09 | Obtained License |
2010-11-21 | Surface Casing Operation Performed |
2010-11-30 | Finished Drilling |
2010-11-30 | Production Casing Operation Performed |
2010-11-30 | Rig Released |
2010-11-30 | Well Mode changed to Drilled and Cased |
2010-12-03 | Well Log Performed |
2011-01-07 | Perforation Treatment Performed - Jet Perforation |
2011-02-11 | Perforation Treatment Performed - Fractured |
2011-02-14 | Well Fluid changed to Gas |
2011-02-14 | Well Mode changed to Testing |
2011-02-18 | Perforation Treatment Performed - Jet Perforation |
2011-02-21 | Perforation Treatment Performed - Fractured |
2011-03-30 | Well Began Production |
2011-03-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-30 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-07 | Perforation | 734.50 | 736.50 | 13 |
2011-02-18 | Perforation | 324.90 | 325.40 | 13 |
2011-02-18 | Perforation | 522.00 | 524.00 | 13 |
2011-02-18 | Perforation | 213.00 | 214.00 | 13 |
2011-02-18 | Perforation | 201.00 | 203.00 | 13 |
2011-02-18 | Perforation | 195.00 | 197.00 | 13 |
2011-02-18 | Perforation | 425.00 | 426.00 | 13 |
2011-02-18 | Perforation | 381.00 | 384.00 | 13 |
2011-02-18 | Perforation | 257.00 | 259.00 | 13 |
2011-02-18 | Perforation | 447.60 | 448.60 | 13 |
2011-02-18 | Perforation | 563.90 | 564.90 | 13 |
2011-01-07 | Perforation | 865.00 | 867.00 | 13 |
2011-02-18 | Perforation | 567.00 | 569.00 | 13 |
2011-02-18 | Perforation | 492.00 | 493.50 | 13 |
2011-02-18 | Perforation | 542.60 | 543.60 | 13 |
2011-02-18 | Perforation | 614.40 | 614.90 | 13 |
2011-02-18 | Perforation | 621.10 | 621.60 | 13 |
2011-02-18 | Perforation | 569.00 | 570.50 | 13 |
2011-02-18 | Perforation | 610.90 | 611.40 | 13 |
2011-02-18 | Perforation | 489.10 | 490.60 | 13 |
2011-02-18 | Perforation | 453.80 | 454.30 | 13 |
2011-02-18 | Perforation | 476.60 | 477.60 | 13 |
2011-02-11 | Fracture | 734.50 | 736.50 | 0 |
2011-02-18 | Perforation | 470.00 | 470.50 | 13 |
2011-02-18 | Perforation | 477.90 | 478.40 | 13 |
2011-02-21 | Fracture | 522.00 | 535.00 | 0 |
2011-02-21 | Fracture | 381.00 | 426.00 | 0 |
2011-02-21 | Fracture | 213.00 | 259.00 | 0 |
2011-02-21 | Fracture | 542.60 | 570.50 | 0 |
2011-02-21 | Fracture | 439.60 | 493.50 | 0 |
2011-02-21 | Fracture | 309.80 | 325.40 | 0 |
2011-02-21 | Fracture | 610.90 | 621.60 | 0 |
2011-02-11 | Fracture | 865.00 | 867.00 | 0 |
2011-02-18 | Perforation | 319.50 | 320.00 | 13 |
2011-02-18 | Perforation | 309.80 | 310.30 | 13 |
2011-02-18 | Perforation | 534.00 | 535.00 | 13 |
2011-02-18 | Perforation | 439.60 | 440.10 | 13 |
2011-02-18 | Perforation | 428.10 | 429.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6529 | 0.0 | 0.0 | 0.0 |
2012 | 8099 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8662 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]