If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244251904020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.054026,"lon":-113.490472,"icon":""}]} |
Location: 02/04-19-024-25W4/0 | |
Location Alias: 02/04-19-24-25 W4M | |
Location Alias 2: 02/04-19-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 19 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 4-19-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423099 | |
License Date: 2010-08-31 | |
License Status: Issued | |
Spud Date: 2010-10-13 | |
Final Drill Date: 2010-11-01 | |
Well Total Depth: 963.00 m | |
Surface Hole Latitude: 51.054026 | |
Surface Hole Longitude: -113.490472 |
Date | Event |
---|---|
2010-08-31 | Obtained License |
2010-10-14 | Surface Casing Operation Performed |
2010-11-01 | Finished Drilling |
2010-11-01 | Well Mode changed to Drilled and Cased |
2010-11-02 | Production Casing Operation Performed |
2010-11-02 | Rig Released |
2010-11-06 | Well Log Performed |
2010-12-19 | Perforation Treatment Performed - Jet Perforation |
2011-01-14 | Perforation Treatment Performed - Fractured |
2011-01-17 | Well Fluid changed to Gas |
2011-01-17 | Well Mode changed to Testing |
2011-01-23 | Perforation Treatment Performed - Jet Perforation |
2011-01-30 | Perforation Treatment Performed - Fractured |
2011-02-09 | Well Began Production |
2011-02-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-09 | Well Mode changed to Flowing |
2016-06-07 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-19 | Perforation | 917.50 | 919.50 | 13 |
2011-01-23 | Perforation | 543.40 | 544.40 | 13 |
2011-01-23 | Perforation | 574.70 | 575.70 | 13 |
2011-01-23 | Perforation | 571.80 | 574.30 | 13 |
2011-01-23 | Perforation | 562.60 | 564.10 | 13 |
2011-01-23 | Perforation | 358.70 | 359.20 | 13 |
2011-01-23 | Perforation | 313.10 | 313.60 | 13 |
2011-01-23 | Perforation | 303.30 | 303.80 | 13 |
2011-01-23 | Perforation | 425.30 | 426.30 | 13 |
2011-01-23 | Perforation | 465.70 | 466.20 | 13 |
2011-01-23 | Perforation | 448.10 | 448.60 | 13 |
2010-12-19 | Perforation | 825.50 | 828.50 | 13 |
2011-01-23 | Perforation | 441.30 | 442.80 | 13 |
2011-01-23 | Perforation | 522.00 | 524.00 | 13 |
2011-01-23 | Perforation | 362.50 | 364.50 | 13 |
2011-01-23 | Perforation | 228.00 | 230.00 | 13 |
2011-01-23 | Perforation | 662.50 | 664.50 | 13 |
2011-01-23 | Perforation | 723.50 | 725.00 | 13 |
2011-01-23 | Perforation | 704.50 | 706.50 | 13 |
2011-01-23 | Perforation | 673.50 | 675.50 | 13 |
2011-01-23 | Perforation | 608.70 | 609.20 | 13 |
2011-01-23 | Perforation | 613.40 | 613.90 | 13 |
2010-12-19 | Perforation | 419.00 | 421.00 | 13 |
2011-01-30 | Fracture | 608.70 | 613.90 | 0 |
2011-01-30 | Fracture | 425.30 | 495.00 | 0 |
2011-01-30 | Fracture | 303.30 | 359.20 | 0 |
2011-01-30 | Fracture | 543.00 | 575.70 | 0 |
2011-01-30 | Fracture | 522.00 | 524.00 | 0 |
2011-01-30 | Fracture | 662.50 | 675.50 | 0 |
2011-01-30 | Fracture | 362.50 | 364.50 | 0 |
2011-01-30 | Fracture | 704.50 | 725.00 | 0 |
2011-01-30 | Fracture | 228.00 | 230.00 | 0 |
2011-01-14 | Fracture | 917.50 | 919.50 | 0 |
2011-01-14 | Fracture | 825.50 | 828.50 | 0 |
2011-01-14 | Fracture | 419.00 | 421.00 | 0 |
2011-01-23 | Perforation | 493.50 | 495.00 | 13 |
2011-01-23 | Perforation | 472.50 | 473.00 | 13 |
2011-01-23 | Perforation | 471.80 | 472.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7704 | 0.0 | 0.0 | 0.0 |
2012 | 8099 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8661 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]