X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244251215020

Well Details

Well ID: 0244251215020
Loading map...
Location: 02/15-12-024-25W4/0
Location Alias: 02/15-12-24-25 W4M
Location Alias 2: 02/15-12-024-25 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 25
Section: 12
County/Municipality: Strathmore
Well Name: EMBER 102 ENTICE 15-12-24-25
Operator Name: Ember Resources Inc.
License Number: 0414252
License Date: 2009-11-19
License Status: Issued
Spud Date: 2010-01-19
Final Drill Date: 2010-01-21
Well Total Depth: 1174.00 m
Surface Hole Latitude: 51.030880
Surface Hole Longitude: -113.369287

For data sources see[1][2]

Well History

Date Event
2009-11-19 Obtained License
2010-01-19 Lost Circulation Occurred
2010-01-20 Direction Drilling Operation Performed - Deviate
2010-01-20 Surface Casing Operation Performed
2010-01-21 Finished Drilling
2010-01-21 Production Casing Operation Performed
2010-01-21 Rig Released
2010-01-21 Well Mode changed to Drilled and Cased
2010-01-26 Well Log Performed
2010-02-16 Perforation Treatment Performed - Jet Perforation
2010-02-26 Perforation Treatment Performed - Fractured
2010-03-05 Well Fluid changed to Coalbed Methane-Coals and Other
2010-03-05 Well Mode changed to Testing
2010-03-12 Well Began Production
2010-03-12 Well Fluid changed to Coalbed Methane-Coals and Other
2010-03-12 Well Mode changed to Flowing
2010-07-26 Perforation Treatment Performed - Fractured
2010-08-31 Well Structure changed to Commingled
2010-11-24 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-20 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-16 Perforation 552.70 553.70 13
2010-02-16 Perforation 469.50 470.00 13
2010-02-16 Perforation 402.60 403.10 13
2010-02-16 Perforation 396.90 397.40 13
2010-02-16 Perforation 595.90 596.90 13
2010-02-16 Perforation 315.50 318.50 13
2010-02-16 Perforation 761.00 761.50 13
2010-02-16 Perforation 540.50 542.50 13
2010-02-16 Perforation 1140.50 1143.50 13
2010-02-16 Perforation 564.50 567.50 13
2010-02-16 Perforation 696.90 697.40 13
2010-02-16 Perforation 526.60 527.10 13
2010-02-16 Perforation 675.40 676.40 13
2010-02-16 Perforation 606.80 609.80 13
2010-02-16 Perforation 701.70 702.20 13
2010-02-16 Perforation 717.30 718.30 13
2010-02-26 Fracture 1140.50 1143.50 0
2010-02-26 Fracture 315.50 318.50 0
2010-07-26 Fracture 359.50 761.50 0
2010-02-16 Perforation 501.70 502.20 13
2010-02-16 Perforation 578.60 579.10 13
2010-02-16 Perforation 573.40 573.90 13
2010-02-16 Perforation 557.30 557.80 13
2010-02-16 Perforation 382.70 383.20 13
2010-02-16 Perforation 377.90 378.40 13
2010-02-16 Perforation 359.50 360.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1924 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-19 Lost Circulation 57.00 138.00

For data sources see[7]

References