If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244250910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.030951,"lon":-113.440024,"icon":""}]} |
Location: 00/10-09-024-25W4/0 | |
Location Alias: 00/10-09-24-25 W4M | |
Location Alias 2: 00/10-09-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 09 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-9-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0387107 | |
License Date: 2007-12-06 | |
License Status: Issued | |
Spud Date: 2007-12-11 | |
Final Drill Date: 2007-12-12 | |
Well Total Depth: 1065.00 m | |
Surface Hole Latitude: 51.030951 | |
Surface Hole Longitude: -113.440024 |
Date | Event |
---|---|
2007-12-06 | Obtained License |
2007-12-11 | Direction Drilling Operation Performed - Deviate |
2007-12-12 | Finished Drilling |
2007-12-12 | Surface Casing Operation Performed |
2007-12-12 | Well Mode changed to Drilled and Cased |
2007-12-13 | Production Casing Operation Performed |
2007-12-13 | Rig Released |
2007-12-30 | Well Log Performed |
2008-01-18 | Perforation Treatment Performed - Jet Perforation |
2008-01-26 | Perforation Treatment Performed - Jet Perforation |
2008-02-10 | Perforation Treatment Performed - Jet Perforation |
2008-02-17 | Perforation Treatment Performed - Jet Perforation |
2008-02-20 | Perforation Treatment Performed - Fractured |
2008-04-16 | Well Began Production |
2008-04-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-04-16 | Well Mode changed to Flowing |
2011-08-21 | Perforation Treatment Performed - Jet Perforation |
2012-03-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-04 | Well Mode changed to Suspended |
2012-03-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-05 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-12-11 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-18 | Perforation | 989.50 | 993.50 | 13 |
2008-02-17 | Perforation | 514.70 | 515.70 | 13 |
2008-02-17 | Perforation | 509.80 | 510.30 | 13 |
2008-02-17 | Perforation | 506.20 | 506.70 | 13 |
2008-02-17 | Perforation | 497.50 | 500.50 | 13 |
2008-02-17 | Perforation | 477.10 | 477.60 | 13 |
2008-02-17 | Perforation | 472.60 | 473.10 | 13 |
2008-02-17 | Perforation | 438.10 | 438.60 | 13 |
2008-02-17 | Perforation | 342.10 | 343.10 | 13 |
2008-02-17 | Perforation | 331.60 | 332.10 | 13 |
2008-02-20 | Fracture | 331.60 | 662.90 | 0 |
2008-01-26 | Perforation | 977.00 | 983.00 | 13 |
2011-08-21 | Perforation | 194.50 | 196.50 | 13 |
2011-08-21 | Perforation | 235.50 | 237.50 | 13 |
2011-08-21 | Perforation | 445.50 | 447.00 | 13 |
2011-08-21 | Perforation | 490.50 | 492.50 | 13 |
2011-08-21 | Perforation | 565.50 | 567.00 | 13 |
2008-02-10 | Perforation | 742.00 | 745.00 | 13 |
2008-02-17 | Perforation | 662.40 | 662.90 | 13 |
2008-02-17 | Perforation | 621.90 | 622.40 | 13 |
2008-02-17 | Perforation | 618.60 | 619.60 | 13 |
2008-02-17 | Perforation | 585.40 | 586.40 | 13 |
2008-02-17 | Perforation | 528.50 | 529.00 | 13 |
2008-02-17 | Perforation | 524.60 | 526.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 6238 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 5592 | 0.0 | 0.0 | 0.0 |
2012 | 7367 | 0.0 | 0.0 | 0.0 |
2013 | 8593 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8697 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8602 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]