If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244250909020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.032518,"lon":-113.42884,"icon":""}]} |
Location: 02/09-09-024-25W4/0 | |
Location Alias: 02/09-09-24-25 W4M | |
Location Alias 2: 02/09-09-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 09 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 9-9-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0424586 | |
License Date: 2010-10-14 | |
License Status: Issued | |
Spud Date: 2010-12-02 | |
Final Drill Date: 2010-12-07 | |
Well Total Depth: 706.00 m | |
Surface Hole Latitude: 51.032518 | |
Surface Hole Longitude: -113.428840 |
Date | Event |
---|---|
2010-01-05 | Well Log Performed |
2010-10-14 | Obtained License |
2010-12-02 | Surface Casing Operation Performed |
2010-12-07 | Finished Drilling |
2010-12-07 | Well Mode changed to Drilled and Cased |
2010-12-08 | Production Casing Operation Performed |
2010-12-08 | Rig Released |
2010-12-08 | Well Log Performed |
2011-01-05 | Perforation Treatment Performed - Jet Perforation |
2011-01-12 | Perforation Treatment Performed - Fractured |
2011-01-17 | Well Fluid changed to Gas |
2011-01-17 | Well Mode changed to Testing |
2011-01-23 | Perforation Treatment Performed - Jet Perforation |
2011-01-30 | Perforation Treatment Performed - Fractured |
2011-10-13 | Well Began Production |
2011-10-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-05 | Perforation | 681.00 | 683.00 | 13 |
2011-01-12 | Fracture | 212.00 | 214.00 | 0 |
2011-01-23 | Perforation | 416.30 | 416.80 | 13 |
2011-01-23 | Perforation | 317.10 | 317.60 | 13 |
2011-01-23 | Perforation | 431.30 | 431.80 | 13 |
2011-01-23 | Perforation | 441.70 | 442.20 | 13 |
2011-01-23 | Perforation | 436.10 | 437.10 | 13 |
2011-01-23 | Perforation | 298.00 | 300.00 | 13 |
2011-01-23 | Perforation | 182.50 | 184.50 | 13 |
2011-01-23 | Perforation | 378.00 | 379.50 | 13 |
2011-01-23 | Perforation | 311.30 | 312.30 | 13 |
2011-01-05 | Perforation | 666.00 | 668.00 | 13 |
2011-01-23 | Perforation | 303.70 | 304.20 | 13 |
2011-01-23 | Perforation | 464.60 | 465.10 | 13 |
2011-01-23 | Perforation | 560.30 | 560.80 | 13 |
2011-01-23 | Perforation | 552.20 | 552.70 | 13 |
2011-01-23 | Perforation | 563.50 | 564.60 | 13 |
2011-01-23 | Perforation | 567.60 | 568.60 | 13 |
2011-01-23 | Perforation | 565.90 | 567.40 | 13 |
2011-01-23 | Perforation | 480.90 | 481.90 | 13 |
2011-01-23 | Perforation | 478.70 | 480.20 | 13 |
2011-01-23 | Perforation | 468.70 | 470.20 | 13 |
2011-01-05 | Perforation | 451.50 | 453.50 | 13 |
2011-01-23 | Perforation | 541.50 | 542.00 | 13 |
2011-01-23 | Perforation | 533.20 | 534.20 | 13 |
2011-01-30 | Fracture | 298.00 | 379.50 | 0 |
2011-01-30 | Fracture | 303.70 | 568.60 | 0 |
2011-01-05 | Perforation | 361.00 | 363.00 | 13 |
2011-01-05 | Perforation | 212.00 | 214.00 | 13 |
2011-01-12 | Fracture | 681.00 | 683.00 | 0 |
2011-01-12 | Fracture | 666.00 | 668.00 | 0 |
2011-01-12 | Fracture | 451.50 | 453.50 | 0 |
2011-01-12 | Fracture | 361.00 | 363.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1915 | 0.0 | 0.0 | 0.0 |
2012 | 8692 | 0.0 | 0.0 | 0.0 |
2013 | 8594 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8697 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8602 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]