If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244242602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.0677,"lon":-113.248247,"icon":""}]} |
Location: 00/02-26-024-24W4/0 | |
Location Alias: 00/02-26-24-24 W4M | |
Location Alias 2: 00/02-26-024-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 24 | |
Section: 26 | |
County/Municipality: Wheatland County | |
Well Name: PCP PARFLESH 2-26-24-24 | |
Operator Name: Lynx Energy ULC | |
License Number: 0178983 | |
License Date: 1995-06-30 | |
License Status: Issued | |
Spud Date: 1995-07-29 | |
Final Drill Date: 1995-08-03 | |
Well Total Depth: 1659.00 m | |
Surface Hole Latitude: 51.067700 | |
Surface Hole Longitude: -113.248247 |
Date | Event |
---|---|
1995-06-30 | Obtained License |
1995-07-29 | Surface Casing Operation Performed |
1995-07-29 | Well Log Performed |
1995-08-03 | Finished Drilling |
1995-08-03 | Well Mode changed to Drilled and Cased |
1995-08-04 | Well Log Performed |
1995-08-05 | Plug Back Performed |
1995-08-05 | Production Casing Operation Performed |
1995-08-05 | Rig Released |
1996-02-28 | Perforation Treatment Performed - Jet Perforation |
1996-02-29 | Perforation Treatment Performed - Fractured |
1997-06-16 | Perforation Treatment Performed - Cement Squeeze |
1997-06-16 | Perforation Treatment Performed - Jet Perforation |
1997-12-11 | Well Began Production |
1997-12-11 | Well Fluid changed to Gas |
1997-12-11 | Well Mode changed to Flowing |
2003-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-04 | Perforation Treatment Performed - Jet Perforation |
2003-11-04 | Plug Back Performed |
2003-11-04 | Well Fluid changed to Gas |
2003-11-04 | Well Mode changed to Abandoned Zone |
2003-11-07 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-02-28 | Perforation | 801.00 | 804.00 | 7 |
2003-11-04 | Perforation | 422.10 | 423.10 | 13 |
2003-11-04 | Perforation | 366.60 | 369.60 | 13 |
2003-11-04 | Perforation | 356.50 | 358.50 | 13 |
2003-11-04 | Perforation | 351.80 | 352.80 | 13 |
2003-11-04 | Perforation | 348.30 | 349.30 | 13 |
2003-11-04 | Perforation | 334.80 | 336.80 | 13 |
2003-11-04 | Perforation | 331.10 | 332.10 | 13 |
2003-11-04 | Perforation | 325.90 | 327.90 | 13 |
2003-11-04 | Perforation | 319.80 | 320.80 | 13 |
2003-11-04 | Perforation | 317.40 | 318.40 | 13 |
1996-02-29 | Fracture | 801.00 | 804.00 | 0 |
2003-11-04 | Perforation | 314.50 | 316.50 | 13 |
2003-11-04 | Perforation | 300.70 | 301.70 | 13 |
2003-11-04 | Perforation | 287.60 | 288.60 | 13 |
2003-11-04 | Perforation | 282.90 | 283.90 | 13 |
2003-11-04 | Perforation | 273.50 | 275.50 | 13 |
2003-11-04 | Perforation | 264.40 | 265.40 | 13 |
2003-11-04 | Perforation | 254.00 | 255.00 | 13 |
2003-11-04 | Perforation | 246.70 | 248.70 | 13 |
2003-11-04 | Perforation | 244.30 | 245.30 | 13 |
2003-11-04 | Perforation | 238.20 | 239.20 | 13 |
1997-06-16 | Cement Squeeze | 801.00 | 804.00 | 0 |
2003-11-04 | Perforation | 232.40 | 233.40 | 13 |
2003-11-04 | Perforation | 228.30 | 231.30 | 13 |
2003-11-04 | Perforation | 225.10 | 226.10 | 13 |
2003-11-04 | Perforation | 223.00 | 224.00 | 13 |
2003-11-04 | Perforation | 219.50 | 220.50 | 13 |
2003-11-07 | Fracture | 219.50 | 495.30 | 0 |
1997-06-16 | Perforation | 801.00 | 804.00 | 7 |
2003-11-04 | Packing Device Capped w/Cement | 786.00 | 794.00 | 0 |
2003-11-04 | Perforation | 493.30 | 495.30 | 13 |
2003-11-04 | Perforation | 455.50 | 458.50 | 13 |
2003-11-04 | Perforation | 435.30 | 436.30 | 13 |
2003-11-04 | Perforation | 429.50 | 430.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 113 | 0.0 | 0.0 | 0.0 |
1998 | 2212 | 0.0 | 0.0 | 0.0 |
1999 | 1439 | 0.0 | 0.0 | 0.0 |
2000 | 4165 | 0.0 | 0.0 | 0.0 |
2001 | 6021 | 0.0 | 0.0 | 0.0 |
2002 | 7966 | 0.0 | 0.0 | 0.0 |
2003 | 7520 | 0.0 | 0.0 | 0.0 |
For data sources see[5]