X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244240101000

Well Details

Well ID: 0244240101000
Loading map...
Location: 00/01-01-024-24W4/0
Location Alias: 00/01-01-24-24 W4M
Location Alias 2: 00/01-01-024-24 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 24
Section: 01
County/Municipality: Wheatland County
Well Name: HARVEST CAVALIER 1-1-24-24
Operator Name: Harvest Operations Corp.
License Number: 0151925
License Date: 1992-03-05
License Status: Suspension
Spud Date: 1992-04-09
Final Drill Date: 1992-04-14
Well Total Depth: 1690.00 m
Surface Hole Latitude: 51.011092
Surface Hole Longitude: -113.218219

For data sources see[1][2]

Well History

Date Event
1992-03-05 Obtained License
1992-04-09 Surface Casing Operation Performed
1992-04-14 Finished Drilling
1992-04-14 Well Log Performed
1992-04-14 Well Mode changed to Drilled and Cased
1992-04-15 Production Casing Operation Performed
1992-04-15 Rig Released
1992-04-18 Perforation Treatment Performed - Jet Perforation
1992-04-18 Well Log Performed
1992-05-07 Well Began Production
1992-05-07 Well Fluid changed to Crude Oil
1992-05-07 Well Mode changed to Pumping
1992-09-11 Perforation Treatment Performed - Jet Perforation
1992-09-11 Well Log Performed
1992-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-30 Well Log Performed
1992-11-08 Well Began Injection
1992-11-08 Well Fluid changed to Water
1992-11-08 Well Type changed to Injection
1996-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-16 Perforation Treatment Performed - Chemical Squeeze
2010-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-15 Plug Back Performed
2010-06-15 Well Fluid changed to Water
2010-06-15 Well Log Performed
2010-06-15 Well Mode changed to Abandoned Zone
2010-06-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-04-18 Perforation 1630.00 1634.00 18
1992-09-11 Perforation 1637.00 1641.00 18
1992-10-25 Acid Treatment 1630.00 1641.00 0
1996-11-19 Acid Treatment 1630.00 1641.00 0
1997-04-16 Chemical Squeeze 1630.00 1641.00 0
2010-06-15 Packing Device Capped w/Cement 1612.00 1620.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2879 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

References