X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244233504000

Well Details

Well ID: 0244233504000
Loading map...
Location: 00/04-35-024-23W4/0
Location Alias: 00/04-35-24-23 W4M
Location Alias 2: 00/04-35-024-23 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 23
Section: 35
County/Municipality: Wheatland County
Well Name: PCP PARFLESH 4-35-24-23
Operator Name: Lynx Energy ULC
License Number: 0178853
License Date: 1995-06-26
License Status: Issued
Spud Date: 1995-07-12
Final Drill Date: 1995-07-18
Well Total Depth: 1613.00 m
Surface Hole Latitude: 51.082039
Surface Hole Longitude: -113.116005

For data sources see[1][2]

Well History

Date Event
1995-06-26 Obtained License
1995-07-13 Surface Casing Operation Performed
1995-07-18 Finished Drilling
1995-07-18 Well Log Performed
1995-07-18 Well Mode changed to Drilled and Cased
1995-07-20 Production Casing Operation Performed
1995-07-20 Rig Released
1996-03-16 Well Log Performed
1996-03-17 Perforation Treatment Performed - Jet Perforation
1996-03-20 Perforation Treatment Performed - Fractured
1997-08-15 Well Began Production
1997-08-15 Well Fluid changed to Gas
1997-08-15 Well Mode changed to Flowing
2004-06-05 Perforation Treatment Performed - Jet Perforation
2004-06-05 Well Log Performed
2004-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-25 Plug Back Performed
2004-07-25 Well Fluid changed to Gas
2004-07-25 Well Log Performed
2004-07-25 Well Mode changed to Abandoned Zone
2005-01-19 Perforation Treatment Performed - Jet Perforation
2005-01-19 Well Log Performed
2005-04-26 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-17 Perforation 1534.00 1538.00 20
2005-01-19 Perforation 468.30 469.30 13
2005-01-19 Perforation 461.90 463.90 13
2005-01-19 Perforation 430.80 431.80 13
2005-01-19 Perforation 415.20 416.20 13
2005-01-19 Perforation 408.40 409.40 13
2005-01-19 Perforation 394.00 395.00 13
2005-01-19 Perforation 337.20 340.20 13
2005-01-19 Perforation 318.20 319.20 13
2005-01-19 Perforation 315.90 316.90 13
2005-01-19 Perforation 304.80 305.80 13
1996-03-20 Fracture 1534.00 1538.00 0
2005-01-19 Perforation 296.70 297.70 13
2005-01-19 Perforation 288.00 289.00 13
2005-01-19 Perforation 284.20 285.20 13
2005-01-19 Perforation 281.50 282.50 13
2005-01-19 Perforation 233.50 234.50 13
2005-01-19 Perforation 228.10 230.10 13
2005-04-26 Fracture 228.10 485.60 0
2004-06-05 Perforation 767.00 771.00 13
2004-07-25 Packing Device Capped w/Cement 1518.50 1521.50 0
2005-01-19 Perforation 484.60 485.60 13
2005-01-19 Perforation 480.00 482.00 13
2005-01-19 Perforation 478.10 479.10 13
2005-01-19 Perforation 476.10 477.10 13
2005-01-19 Perforation 471.00 472.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2678 0.0 0.0 0.0
1998 2925 0.0 0.0 0.0
1999 1005 0.0 0.0 0.0
2000 4050 0.0 0.0 0.0
2001 1156 0.0 0.0 0.0
2002 1545 0.0 0.0 0.0
2003 7892 0.0 0.0 0.0
2004 609 0.0 0.0 0.0

For data sources see[5]

References