If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244232508002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.071937,"lon":-113.075763,"icon":""}]} |
Location: 00/08-25-024-23W4/2 | |
Location Alias: 00/08-25-24-23 W4M | |
Location Alias 2: 00/08-25-024-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 23 | |
Section: 25 | |
County/Municipality: Wheatland County | |
Well Name: PCP PCR PARFLESH 8-25-24-23 | |
Operator Name: Lynx Energy ULC | |
License Number: 0230108 | |
License Date: 1999-12-09 | |
License Status: Issued | |
Spud Date: 2000-01-05 | |
Final Drill Date: 2000-02-07 | |
Well Total Depth: 1600.00 m | |
Surface Hole Latitude: 51.071937 | |
Surface Hole Longitude: -113.075763 |
Date | Event |
---|---|
1999-12-09 | Obtained License |
2000-01-05 | Surface Casing Operation Performed |
2000-02-07 | Finished Drilling |
2000-02-07 | Well Log Performed |
2000-02-07 | Well Mode changed to Drilled and Cased |
2000-02-08 | Production Casing Operation Performed |
2000-02-08 | Well Log Performed |
2000-02-09 | Rig Released |
2000-02-21 | Perforation Treatment Performed - Jet Perforation |
2000-02-21 | Well Log Performed |
2000-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-14 | Plug Back Performed |
2000-10-04 | Well Log Performed |
2000-10-11 | Well Log Performed |
2000-10-22 | Perforation Treatment Performed - Jet Perforation |
2000-10-22 | Well Mode changed to Drilled and Cased |
2000-11-09 | Perforation Treatment Performed - Jet Perforation |
2000-11-22 | Perforation Treatment Performed - Jet Perforation |
2001-05-05 | Well Log Performed |
2001-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-13 | Plug Back Performed |
2001-06-14 | Well Log Performed |
2001-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-06-15 | Plug Back Performed |
2001-07-20 | Perforation Treatment Performed - Fractured |
2002-04-29 | Well Began Production |
2002-04-29 | Well Fluid changed to Gas |
2002-04-29 | Well Mode changed to Flowing |
2002-10-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-10-19 | Plug Back Performed |
2002-10-19 | Well Fluid changed to Gas |
2002-10-19 | Well Mode changed to Abandoned Zone |
2002-10-20 | Perforation Treatment Performed - Jet Perforation |
2002-10-21 | Well Log Performed |
2003-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-27 | Perforation Treatment Performed - Jet Perforation |
2003-08-27 | Plug Back Performed |
2003-09-14 | Perforation Treatment Performed - Fractured |
2003-10-04 | Well Log Performed |
2007-09-18 | Well Log Performed |
2009-04-29 | Well Log Performed |
2009-10-26 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-02-21 | Perforation | 1544.50 | 1546.50 | 20 |
2002-10-20 | Perforation | 526.00 | 530.00 | 13 |
2002-10-20 | Perforation | 523.00 | 526.00 | 13 |
2003-08-27 | Packing Device Capped w/Cement | 507.00 | 515.00 | 0 |
2003-08-27 | Perforation | 445.00 | 446.00 | 13 |
2003-08-27 | Perforation | 439.30 | 440.30 | 13 |
2003-08-27 | Perforation | 397.00 | 398.00 | 13 |
2003-08-27 | Perforation | 377.70 | 378.70 | 13 |
2003-08-27 | Perforation | 365.00 | 366.00 | 13 |
2003-08-27 | Perforation | 363.00 | 364.00 | 13 |
2003-08-27 | Perforation | 310.30 | 311.30 | 13 |
2000-09-14 | Packing Device Capped w/Cement | 1523.00 | 1531.00 | 0 |
2003-08-27 | Perforation | 306.60 | 309.60 | 13 |
2003-08-27 | Perforation | 285.30 | 286.30 | 13 |
2003-08-27 | Perforation | 282.50 | 283.50 | 13 |
2003-08-27 | Perforation | 273.00 | 274.00 | 13 |
2003-08-27 | Perforation | 262.10 | 264.10 | 13 |
2003-08-27 | Perforation | 204.40 | 205.40 | 13 |
2003-09-14 | Fracture | 204.40 | 446.00 | 0 |
2000-10-22 | Perforation | 741.00 | 743.00 | 7 |
2000-11-09 | Perforation | 712.00 | 715.00 | 7 |
2000-11-22 | Perforation | 678.00 | 681.00 | 7 |
2001-06-13 | Packing Device Capped w/Cement | 732.00 | 735.00 | 0 |
2001-06-15 | Packing Device Capped w/Cement | 705.00 | 708.00 | 0 |
2001-07-20 | Fracture | 678.00 | 681.00 | 0 |
2002-10-19 | Packing Device Capped w/Cement | 662.00 | 670.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]