If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244231916002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.066127,"lon":-113.197565,"icon":""}]} |
Location: 00/16-19-024-23W4/2 | |
Location Alias: 00/16-19-24-23 W4M | |
Location Alias 2: 00/16-19-024-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 23 | |
Section: 19 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PARFLESH 16-19-24-23 | |
Operator Name: Lynx Energy ULC | |
License Number: 0388880 | |
License Date: 2007-12-18 | |
License Status: Suspension | |
Spud Date: 2008-02-01 | |
Final Drill Date: 2008-02-12 | |
Well Total Depth: 1640.00 m | |
Surface Hole Latitude: 51.066127 | |
Surface Hole Longitude: -113.197565 |
Date | Event |
---|---|
2007-12-18 | Obtained License |
2008-02-01 | Surface Casing Operation Performed |
2008-02-11 | Direction Drilling Operation Performed - Deviate |
2008-02-12 | Finished Drilling |
2008-02-12 | Well Log Performed |
2008-02-12 | Well Mode changed to Drilled and Cased |
2008-02-13 | Production Casing Operation Performed |
2008-02-13 | Rig Released |
2008-02-21 | Perforation Treatment Performed - Jet Perforation |
2008-02-21 | Well Log Performed |
2008-02-26 | Well Log Performed |
2008-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-27 | Perforation Treatment Performed - Jet Perforation |
2008-02-27 | Plug Back Performed |
2008-02-27 | Well Log Performed |
2008-03-09 | Perforation Treatment Performed - Fractured |
2008-03-10 | Well Fluid changed to Gas |
2008-03-10 | Well Mode changed to Testing |
2008-07-10 | Well Began Production |
2008-07-10 | Well Fluid changed to Gas |
2008-07-10 | Well Mode changed to Flowing |
2009-06-22 | Perforation Treatment Performed - Jet Perforation |
2009-06-22 | Well Log Performed |
2009-06-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-06-26 | Well Mode changed to Flowing |
2019-04-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2019-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-02-11 | 863.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-02-21 | Perforation | 1380.00 | 1381.00 | 17 |
2008-03-09 | Fracture | 693.00 | 694.50 | 0 |
2008-03-09 | Fracture | 659.00 | 661.50 | 0 |
2008-03-09 | Fracture | 640.00 | 647.50 | 0 |
2008-03-09 | Fracture | 376.50 | 381.50 | 0 |
2009-06-22 | Perforation | 470.40 | 471.40 | 13 |
2009-06-22 | Perforation | 425.70 | 426.70 | 13 |
2009-06-22 | Perforation | 424.80 | 425.80 | 13 |
2009-06-22 | Perforation | 410.40 | 411.40 | 13 |
2009-06-22 | Perforation | 396.70 | 397.70 | 13 |
2009-06-22 | Perforation | 337.40 | 339.40 | 13 |
2008-02-27 | Packing Device Capped w/Cement | 1365.00 | 1373.00 | 0 |
2009-06-22 | Perforation | 328.10 | 330.10 | 13 |
2009-06-22 | Perforation | 324.60 | 325.60 | 13 |
2009-06-22 | Perforation | 305.90 | 306.90 | 13 |
2009-06-22 | Perforation | 300.60 | 303.60 | 13 |
2009-06-22 | Perforation | 300.00 | 301.00 | 13 |
2009-06-22 | Perforation | 295.70 | 296.70 | 13 |
2009-06-22 | Perforation | 291.30 | 292.30 | 13 |
2008-02-27 | Perforation | 775.00 | 778.50 | 13 |
2008-02-27 | Perforation | 693.00 | 694.50 | 13 |
2008-02-27 | Perforation | 659.00 | 661.50 | 13 |
2008-02-27 | Perforation | 646.00 | 647.50 | 13 |
2008-02-27 | Perforation | 640.00 | 641.00 | 13 |
2008-02-27 | Perforation | 376.50 | 381.50 | 13 |
2008-03-09 | Fracture | 775.00 | 778.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 3207 | 0.0 | 0.0 | 0.0 |
2009 | 8147 | 0.0 | 0.0 | 0.0 |
2010 | 8706 | 0.0 | 0.0 | 0.0 |
2011 | 8709 | 0.0 | 0.0 | 0.0 |
2012 | 8652 | 0.0 | 0.0 | 0.0 |
2013 | 8650 | 0.0 | 0.0 | 0.0 |
2014 | 8687 | 0.0 | 0.0 | 0.0 |
2015 | 8668 | 0.0 | 0.0 | 0.0 |
2016 | 8732 | 0.0 | 0.0 | 0.0 |
2017 | 8661 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 1656 | 0.0 | 0.0 | 0.0 |
For data sources see[6]