X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244231903002

Well Details

Well ID: 0244231903002
Loading map...
Location: 00/03-19-024-23W4/2
Location Alias: 00/03-19-24-23 W4M
Location Alias 2: 00/03-19-024-23 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 23
Section: 19
County/Municipality: Wheatland County
Well Name: PCP PARFLESH 3-19-24-23
Operator Name: Lynx Energy ULC
License Number: 0164169
License Date: 1994-01-19
License Status: Suspension
Spud Date: 1994-02-05
Final Drill Date: 1994-02-11
Well Total Depth: 1630.00 m
Surface Hole Latitude: 51.053116
Surface Hole Longitude: -113.204671

For data sources see[1][2]

Well History

Date Event
1994-01-19 Obtained License
1994-02-06 Surface Casing Operation Performed
1994-02-11 Finished Drilling
1994-02-11 Well Mode changed to Drilled and Cased
1994-02-12 Well Log Performed
1994-02-14 Drill Stem Test Performed
1994-02-15 Production Casing Operation Performed
1994-02-15 Rig Released
1994-03-24 Well Log Performed
1994-03-25 Perforation Treatment Performed - Jet Perforation
1994-03-27 Perforation Treatment Performed - Fractured
1994-03-30 Well Log Performed
1994-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-01 Perforation Treatment Performed - Jet Perforation
1994-04-04 Well Log Performed
1994-04-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-26 Perforation Treatment Performed - Jet Perforation
2002-11-27 Well Log Performed
2002-12-02 Perforation Treatment Performed - Fractured
2008-04-04 Well Began Production
2008-04-04 Well Fluid changed to Coalbed Methane-Coals Only
2008-04-04 Well Mode changed to Flowing
2019-05-01 Well Fluid changed to Coalbed Methane-Coals Only
2019-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-25 Perforation 1390.50 1393.50 14
2002-11-26 Perforation 394.00 395.00 13
2002-11-26 Perforation 333.70 335.70 13
2002-11-26 Perforation 325.00 327.00 13
2002-11-26 Perforation 321.00 322.00 13
2002-11-26 Perforation 302.90 304.90 13
2002-11-26 Perforation 297.60 299.60 13
2002-11-26 Perforation 295.00 296.00 13
2002-11-26 Perforation 291.80 292.80 13
2002-11-26 Perforation 288.00 289.00 13
2002-12-02 Fracture 288.00 471.20 0
1994-03-27 Fracture 1390.50 1393.50 0
1994-03-31 Packing Device Capped w/Cement 1376.00 1384.00 0
1994-04-01 Perforation 1343.00 1345.00 13
1994-04-05 Packing Device Capped w/Cement 1322.00 1330.00 0
2002-11-26 Perforation 470.20 471.20 13
2002-11-26 Perforation 467.00 468.00 13
2002-11-26 Perforation 421.90 423.90 13
2002-11-26 Perforation 409.00 410.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 6528 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8708 0.0 0.0 0.0
2011 8709 0.0 0.0 0.0
2012 8652 0.0 0.0 0.0
2013 8650 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8668 0.0 0.0 0.0
2016 8732 0.0 0.0 0.0
2017 8661 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 1656 0.0 0.0 0.0

For data sources see[5]

References