X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244231015002

Well Details

Well ID: 0244231015002
Loading map...
Location: 00/15-10-024-23W4/2
Location Alias: 00/15-10-24-23 W4M
Location Alias 2: 00/15-10-024-23 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 23
Section: 10
County/Municipality: Wheatland County
Well Name: PCP CAVALIER 15-10-24-23
Operator Name: Lynx Energy ULC
License Number: 0157811
License Date: 1993-04-15
License Status: Issued
Spud Date: 1993-05-12
Final Drill Date: 1993-05-17
Well Total Depth: 1585.00 m
Surface Hole Latitude: 51.036794
Surface Hole Longitude: -113.129608

For data sources see[1][2]

Well History

Date Event
1993-04-15 Obtained License
1993-05-13 Surface Casing Operation Performed
1993-05-17 Finished Drilling
1993-05-17 Well Log Performed
1993-05-17 Well Mode changed to Drilled and Cased
1993-05-18 Drill Stem Test Performed
1993-05-19 Production Casing Operation Performed
1993-05-19 Rig Released
1993-06-12 Well Log Performed
1993-06-13 Perforation Treatment Performed - Jet Perforation
1993-06-16 Perforation Treatment Performed - Fractured
1993-06-19 Well Log Performed
1993-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-20 Perforation Treatment Performed - Jet Perforation
1993-06-20 Plug Back Performed
1993-06-21 Perforation Treatment Performed - Fractured
1994-03-07 Well Log Performed
1994-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-08 Plug Back Performed
1994-03-09 Well Log Performed
1994-03-10 Perforation Treatment Performed - Jet Perforation
1994-03-15 Well Log Performed
1995-02-12 Well Began Production
1995-02-12 Well Fluid changed to Gas
1995-02-12 Well Mode changed to Flowing
2005-06-22 Well Log Performed
2005-07-03 Perforation Treatment Performed - Jet Perforation
2005-07-03 Well Log Performed
2005-07-08 Perforation Treatment Performed - Jet Perforation
2005-07-08 Well Log Performed
2005-07-23 Perforation Treatment Performed - Fractured
2005-08-09 Well Log Performed
2006-10-01 Well Fluid changed to Gas
2006-10-01 Well Mode changed to Suspended
2010-12-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-13 Perforation 1561.50 1564.00 13
2005-07-03 Perforation 1322.50 1325.50 17
2005-07-08 Perforation 641.00 645.00 17
2005-07-23 Fracture 641.00 645.00 0
2010-12-05 Perforation 756.00 758.00 13
2010-12-05 Perforation 676.80 678.80 13
2010-12-05 Perforation 626.20 630.20 13
2010-12-05 Perforation 620.00 622.00 13
2010-12-05 Perforation 740.80 741.80 13
2010-12-05 Perforation 736.80 737.80 13
2010-12-05 Perforation 734.50 735.50 13
1993-06-16 Fracture 1561.50 1564.00 0
2010-12-05 Perforation 717.80 718.80 13
2010-12-05 Perforation 693.30 694.30 13
2010-12-05 Perforation 469.80 470.80 13
2010-12-05 Perforation 451.30 452.30 13
2010-12-05 Perforation 449.30 450.30 13
2010-12-05 Perforation 408.40 410.40 13
2010-12-05 Perforation 387.80 388.80 13
2010-12-05 Perforation 374.30 375.30 13
2010-12-05 Perforation 316.60 319.60 13
2010-12-05 Perforation 300.80 302.80 13
1993-06-20 Packing Device Capped w/Cement 1546.00 1554.00 0
2010-12-05 Perforation 288.80 289.80 13
2010-12-05 Perforation 281.50 282.50 13
2010-12-05 Perforation 278.60 279.60 13
2010-12-05 Perforation 274.90 275.90 13
2010-12-05 Perforation 270.00 271.00 13
2010-12-05 Perforation 240.50 241.50 13
2010-12-05 Perforation 236.40 237.40 13
2010-12-05 Perforation 228.50 229.50 13
2010-12-05 Perforation 227.00 228.00 13
2010-12-05 Perforation 219.10 220.10 13
1993-06-20 Perforation 1526.00 1531.00 13
1993-06-21 Fracture 1526.00 1531.00 0
1994-03-08 Packing Device Capped w/Cement 1502.00 1510.00 0
1994-03-10 Perforation 1336.00 1338.00 13
1994-03-10 Perforation 1359.00 1362.50 13
1994-03-10 Perforation 1368.00 1370.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5428 0.0 0.0 0.0
1996 7649 0.0 0.0 0.0
1997 7648 0.0 0.0 0.0
1998 7959 0.0 0.0 0.0
1999 8618 0.0 0.0 0.0
2000 7974 0.0 0.0 0.0
2001 7478 0.0 0.0 0.0
2002 8260 0.0 0.0 0.0
2003 3340 0.0 0.0 0.0
2004 2160 0.0 0.0 0.0
2005 651 0.0 0.0 0.0

For data sources see[5]

References