X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244231002000

Well Details

Well ID: 0244231002000
Loading map...
Location: 00/02-10-024-23W4/0
Location Alias: 00/02-10-24-23 W4M
Location Alias 2: 00/02-10-024-23 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 23
Section: 10
County/Municipality: Wheatland County
Well Name: PCP PCR CAVALIER 2-10-24-23
Operator Name: Lynx Energy ULC
License Number: 0252286
License Date: 2001-03-01
License Status: Suspension
Spud Date: 2001-05-22
Final Drill Date: 2001-05-26
Well Total Depth: 1568.50 m
Surface Hole Latitude: 51.026458
Surface Hole Longitude: -113.132867

For data sources see[1][2]

Well History

Date Event
2001-03-01 Obtained License
2001-05-22 Surface Casing Operation Performed
2001-05-26 Finished Drilling
2001-05-26 Well Log Performed
2001-05-27 Production Casing Operation Performed
2001-05-27 Rig Released
2001-05-27 Well Mode changed to Drilled and Cased
2001-06-17 Well Log Performed
2001-06-26 Perforation Treatment Performed - Jet Perforation
2001-06-26 Well Log Performed
2001-07-21 Perforation Treatment Performed - Fractured
2001-09-30 Well Began Production
2001-09-30 Well Fluid changed to Gas
2001-09-30 Well Mode changed to Flowing
2003-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-02 Perforation Treatment Performed - Jet Perforation
2003-03-02 Plug Back Performed
2003-03-02 Well Fluid changed to Gas
2003-03-02 Well Mode changed to Abandoned Zone
2003-03-03 Well Log Performed
2003-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-17 Plug Back Performed
2003-03-18 Perforation Treatment Performed - Jet Perforation
2003-03-19 Well Log Performed
2003-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-28 Plug Back Performed
2003-05-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-06-26 Perforation 1539.00 1542.00 17
2001-07-21 Fracture 1539.00 1542.00 0
2003-03-02 Packing Device Capped w/Cement 1530.00 1538.00 0
2003-03-02 Perforation 1327.50 1329.00 17
2003-03-17 Packing Device Capped w/Cement 1323.00 1326.00 0
2003-03-18 Perforation 1312.00 1314.00 17
2003-05-28 Packing Device Capped w/Cement 1296.00 1304.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1153 0.0 0.0 0.0
2002 3063 0.0 0.0 0.0
2003 123 0.0 0.0 0.0

For data sources see[5]

References