X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244230311022

Well Details

Well ID: 0244230311022
Loading map...
Location: 02/11-03-024-23W4/2
Location Alias: 02/11-03-24-23 W4M
Location Alias 2: 02/11-03-024-23 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 23
Section: 03
County/Municipality: Wheatland County
Well Name: ECA ECOG 102 CAVALIER 11-3-24-23
Operator Name: Lynx Energy ULC
License Number: 0350727
License Date: 2006-01-31
License Status: Amended
Spud Date: 2006-02-16
Final Drill Date: 2006-02-24
Well Total Depth: 1623.00 m
Surface Hole Latitude: 51.018841
Surface Hole Longitude: -113.136403

For data sources see[1][2]

Well History

Date Event
2006-01-31 Obtained License
2006-02-16 Surface Casing Operation Performed
2006-02-23 Direction Drilling Operation Performed - Deviate
2006-02-24 Finished Drilling
2006-02-24 Well Mode changed to Drilled and Cased
2006-02-25 Well Log Performed
2006-02-26 Production Casing Operation Performed
2006-02-26 Rig Released
2006-03-13 Perforation Treatment Performed - Jet Perforation
2006-03-13 Well Log Performed
2006-05-04 Well Log Performed
2006-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-08 Perforation Treatment Performed - Jet Perforation
2006-05-08 Plug Back Performed
2006-05-08 Well Log Performed
2006-05-18 Perforation Treatment Performed - Jet Perforation
2006-05-18 Well Log Performed
2006-06-04 Perforation Treatment Performed - Jet Perforation
2006-06-04 Well Log Performed
2006-07-04 Well Log Performed
2006-07-24 Perforation Treatment Performed - Fractured
2006-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-08 Plug Back Performed
2006-10-08 Well Mode changed to Abandoned Zone
2006-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-09 Perforation Treatment Performed - Jet Perforation
2006-10-09 Plug Back Performed
2006-10-09 Well Log Performed
2006-10-12 Perforation Treatment Performed - Fractured
2008-06-03 Perforation Treatment Performed - Jet Perforation
2008-06-03 Well Log Performed
2008-06-22 Perforation Treatment Performed - Fractured
2010-05-23 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-02-23 595.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-13 Perforation 1562.00 1565.00 17
2006-10-09 Packing Device Capped w/Cement 1327.00 1335.00 0
2006-10-09 Perforation 758.00 760.50 13
2006-10-09 Perforation 686.00 687.00 13
2006-10-09 Perforation 681.00 682.50 13
2006-10-09 Perforation 652.00 654.00 13
2006-10-09 Perforation 612.00 613.00 13
2006-10-09 Perforation 585.00 587.00 13
2006-10-12 Fracture 758.00 760.50 0
2006-10-12 Fracture 681.00 687.00 0
2006-10-12 Fracture 652.00 654.00 0
2006-03-13 Perforation 1554.00 1556.50 17
2006-10-12 Fracture 612.00 613.00 0
2006-10-12 Fracture 585.00 587.00 0
2008-06-03 Perforation 744.30 745.30 13
2008-06-03 Perforation 737.50 738.50 13
2008-06-03 Perforation 454.30 455.30 13
2008-06-03 Perforation 452.00 453.00 13
2008-06-03 Perforation 449.80 450.80 13
2008-06-03 Perforation 405.10 406.10 13
2008-06-03 Perforation 318.20 321.20 13
2008-06-03 Perforation 302.40 304.40 13
2006-05-08 Packing Device Capped w/Cement 1540.00 1548.00 0
2008-06-03 Perforation 291.00 292.00 13
2008-06-03 Perforation 284.50 286.50 13
2008-06-03 Perforation 276.80 277.80 13
2008-06-03 Perforation 273.10 274.10 13
2008-06-03 Perforation 221.20 222.20 13
2008-06-22 Fracture 221.20 745.30 0
2010-05-23 Perforation 692.00 695.00 13
2010-05-23 Perforation 643.00 645.00 13
2010-05-23 Perforation 623.50 625.50 13
2010-05-23 Perforation 577.00 579.00 13
2006-05-08 Perforation 1392.00 1395.00 17
2006-05-18 Perforation 1360.00 1363.00 17
2006-06-04 Perforation 1343.00 1345.00 17
2006-07-24 Fracture 1343.00 1345.00 0
2006-10-08 Packing Device Capped w/Cement 1377.00 1385.00 0
2006-10-08 Packing Device Capped w/Cement 1350.00 1358.00 0

For data sources see[5]



References